Schools-NC-v4.1 MRc5: Construction and Demolition Waste Management 1-2 points
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To reduce construction and demolition waste disposed of in landfills and incineration facilities through waste prevention and by reusing, recovering, and recycling materials, and conserving resources for future generations. To delay the need for new landfill facilities that are often located in frontline communities and create green jobs and materials markets for building construction services.Requirements
Develop and implement a construction and demolition waste management plan and achieve points through waste prevention and/or diversion.
Waste Management Plan and Report:
All projects must develop and implement a construction and demolition waste management plan:
- Identify strategies to reduce the generation of waste during project design and construction.
- Establish waste diversion goals for the project by identifying the materials (both structural and nonstructural) targeted for diversion.
- Describe the diversion strategies planned for the project. Describe where materials will be taken including expected diversion rates for each material.
Provide a final waste management report detailing all waste generated, including disposal and diversion rates for the project. Calculations can be by weight or volume but must be consistent throughout. Exclude excavated soil and land-clearing debris from calculations. Include materials destined for alternative daily cover (ADC) in the calculations as waste (not diversion). Any materials sent to a commingled recycling facility for processing must take the facility average recycling rate and must include any ADC as waste (not diversion).
Option 1. Diversion (1 point)
Follow the Waste Management Plan and divert at least 50% of the total construction and demolition materials from landfills and incineration facilities.AND/OR
Option 2. Waste Prevention (2 points)
Follow the Waste Management Plan and prevent waste through reuse and source reduction design strategies. Salvage or recycle at least 50% of demolition debris and utilize waste minimizing design strategies and construction techniques for new construction elements. Track all demolition debris generated by the project from start of construction through project completion. Also trach all new construction waste materials generated from start of construction through project completion to determine the project's total waste generation from new construction activities. Exclude hazardous materials and land-clearing debris from calculations.
Points are awarded as follows:
Divert at least 50% of all demolition waste, if any. Generate less than 10 lbs./ft2 (50 kg/m2) of waste materials from all new construction activities. (2 points)
See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To reduce construction and demolition waste disposed of in landfills and incineration facilities through waste prevention and by reusing, recovering, and recycling materials, and conserving resources for future generations. To delay the need for new landfill facilities that are often located in frontline communities and create green jobs and materials markets for building construction services.Requirements
Develop and implement a construction and demolition waste management plan and achieve points through waste prevention and/or diversion.
Waste Management Plan and Report:
All projects must develop and implement a construction and demolition waste management plan:
- Identify strategies to reduce the generation of waste during project design and construction.
- Establish waste diversion goals for the project by identifying the materials (both structural and nonstructural) targeted for diversion.
- Describe the diversion strategies planned for the project. Describe where materials will be taken including expected diversion rates for each material.
Provide a final waste management report detailing all waste generated, including disposal and diversion rates for the project. Calculations can be by weight or volume but must be consistent throughout. Exclude excavated soil and land-clearing debris from calculations. Include materials destined for alternative daily cover (ADC) in the calculations as waste (not diversion). Any materials sent to a commingled recycling facility for processing must take the facility average recycling rate and must include any ADC as waste (not diversion).
Option 1. Diversion (1 point)
Follow the Waste Management Plan and divert at least 50% of the total construction and demolition materials from landfills and incineration facilities.AND/OR
Option 2. Waste Prevention (2 points)
Follow the Waste Management Plan and prevent waste through reuse and source reduction design strategies. Salvage or recycle at least 50% of demolition debris and utilize waste minimizing design strategies and construction techniques for new construction elements. Track all demolition debris generated by the project from start of construction through project completion. Also trach all new construction waste materials generated from start of construction through project completion to determine the project's total waste generation from new construction activities. Exclude hazardous materials and land-clearing debris from calculations.
Points are awarded as follows:
Divert at least 50% of all demolition waste, if any. Generate less than 10 lbs./ft2 (50 kg/m2) of waste materials from all new construction activities. (2 points)
See all forum discussions about this credit »