Forum quick links
Will "representative modelling" meet prerequisite/ASHRAE reqs?
CS-2009 EAp2:Minimum energy performanceposted by Ward Miller on
The project at hand is ~500,000 sf and contains 4 buildings, each with 2 sub-floors, a ground floor, and between 4 and 11 stories and a district heating source.
Modeling OA with Demand control ventilation
CS-2009 EAp2:Minimum energy performanceposted by Indochine Engineering VN on
Hi, I have demand control ventilation for every AHU.
compliance with ASHRAE 90.1 2007
CS-2009 EAp2:Minimum energy performanceposted by shashank jain on
In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007.
VAV boxes
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
ENERGY MODELING
CS-2009 EAp2:Minimum energy performanceposted by RICARDO GUEMEZ DIAZ on
Hello, In Mexico City we have a one project that is integrated in two phases, the phase one start the construction phase in 2011 and the second phase will start the construction phase the next year
Lighting control in Tenant space
CS-2009 EAp2:Minimum energy performanceposted by Indochine Engineering VN on
Hi, I have an open office, restaurant, apartment for rent in the mixed use building project. Im confused with lighting control mandatory section 9.4 ASHRAE.
Eficiency of Electric motors operated with VFD
CS-2009 EAp2:Minimum energy performanceposted by Pedro Urazan on
I would like to know if electric motors that are going to be operated by a VFD (Variable Frequency Drive), need to comply with the eficiency requirements of the ASHRAE 90.1 table 10.8. Thanks
Compliance with Appendix G ASHRAE
CS-2009 EAp2:Minimum energy performanceposted by Daniela Castro Salgado on
We have a 14 storie-152600sft building which we are interested in certifying, however, there are 2 problems: 1. The client does not want a water treatment plant. 2.
existing building modeling
CS-2009 EAp2:Minimum energy performanceposted by Alfonzo Collins on
I am modeling an existing building right now. The opaque envelope will be maintained (walls and roof) but the entire inside, all HVAC systems, and windows will be replaced.