U-factor for existing masonry wall
CS-2009 EAp2:Minimum energy performanceposted by Morteza Kasmaei on
Hello All In this LEED_CS project, the existing masonry wall was changed to the following configuration (from outside to inside): - glass-fiber-reinforced concrete panels [TAKTL] on galvanized st
Ashrae 90.1 - Tradable Surfaces
CS-2009 EAp2:Minimum energy performanceposted by Angela Saggin on
Hi! We have some canopies in our project, but one of these canopies is 5w over-lighted. It's our understanding that we can make it up by under-lighting other tradable surface.
Must the space for the Systems 9 and 10 be heated?
CS-2009 EAp2:Minimum energy performanceposted by tiantian zhou on
Dear sir/madam, For the area of mechanical ventilation, the actual design has no heating but ventilation.
COP - Future tenants - Energy Efficiency Simulation
CS-2009 EAp2:Minimum energy performanceposted by Marcio Alberto Casado Pereira on
Hi, It is possible to demand a future COP to comply with for future tenants and consider this value for the simulation (Eap2)? Thanks in advance.
Fan Power Limitation Pressure Drop Adjustment
CS-2009 EAp2:Minimum energy performanceposted by Yu Wang on
Hallo everyone, I am modeling a C&S project with 8 floors, and system 7 will be used in the Baseline Case.
Minimum air flows for simulation
CS-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
Hello Marcus. I have a question regarding minimum air flows for a core and shell project. the minimun cfm for the simulation must be the same in the energy model and IEQ p1 and IEQ c1.
ASHRAE mandatory provision 5.4
CS-2009 EAp2:Minimum energy performanceposted by Sandra Holmström on
Requirements according to ASHRAE mandatory provision 5.4: Cargo doors and loading dock doors shall be equipped with weather seals to restrict infiltration when vehicles are parked to doorway.
Per area or Per linear meter requirement?
CS-2009 EAp2:Minimum energy performanceposted by Katherine Ann Resurreccion on
Our project proposed to install facade lighting system. They will use a linear tube lamp and mount it to the facade. The lamp consumption is 3.5W per linear foot.
supplemental heating system
CS-2009 EAp2:Minimum energy performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Building Slabs: not in Developer's scope of work
CS-2009 EAp2:Minimum energy performanceposted by LEED Pro Consultant on
In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope).