Forum quick links
Site lighting calculations
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
We have a campus projects with three relatively equal size multi-story buildings. The owner will manage the three buildings separately. Each project will pay for their own utilities.
Automated Demand Response
CS-2009 EAp2:Minimum energy performanceposted by Ryan McEvoy on
We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum energy performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.
HVAC system for 5 storey office block.
CS-2009 EAp2:Minimum energy performanceposted by Ciaran McCabe on
I am modeling a core and shell building with 5 floors. This building will be served by two air handling units.
Record Time for ASHRAE appx G Simulation?
CS-2009 EAp2:Minimum energy performanceposted by Jean Marais on
What's your record time? What software did you use?
EAp2 Sample L4 Narrative
CS-2009 EAp2:Minimum energy performanceposted by Thomas Newbold on
Are there any sample narratives available on LEEDUser to satisfy Upload L-4? "Provide a detailed narrative describing the intended credit Files: approach, including energy efficiency measures that
Building envelope
CS-2009 EAp2:Minimum energy performanceposted by Frantisek Macholda on
Hello, we have a building with irregular shape of facade. The facade consists of horizontal lamellas with vertical gazing - like steps, 3 per each floor.
Air Cooled Chiller Vs Water Cooled Chiller With Dry Air Cooler
CS-2009 EAp2:Minimum energy performanceposted by Ciaran McCabe on
Has anyone any feedback in modelling either of these two chillers in a 90.1 Energy model.
Tenant Space / Core & Shell Building
CS-2009 EAp2:Minimum energy performanceposted by Katherine Ann Resurreccion on
We are working on CS project, a shopping mall, 57% is major renovation while the other 43% is expansion.