Forum quick links
HVAC modelling for Tenant Occupied Spaces
CS-2009 EAp2:Minimum energy performanceposted by Saumendra Aggrawal on
I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.
Modeling DCV in open space offices
CS-2009 EAp2:Minimum energy performanceposted by Lucie Cervena on
x
Facade lighting for advertising
CS-2009 EAp2:Minimum energy performanceposted by Lolita Wu on
We have a question about facade lighting for a retail project. As the mandatory requirement, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface.
Des Heating
CS-2009 EAp2:Minimum energy performanceposted by Lorey Flick on
I have 5 existing buildings on a campus that are served by a common (existing to remain) steam boiler plant. There are no other buildings served by this plant.
chiller reference values for energy modeling and compliance form
CS-2009 EAp2:Minimum energy performanceposted by Adam Targowski on
I am working on a project which is equipped with air-cooled chillers. According to ASHRAE 90.1-2007, Appendix G, table G3.1.3.7.
Using Lease Agreement for Undesigned Elements
CS-2009 EAp2:Minimum energy performanceposted by Tony Schafer on
I am wondering if the tenant lease agreement can be used to specify undesigned elements for EAp2 similar to how it is used to achieve other credits.
buildings in and out the boundary share the same heating source
CS-2009 EAp2:Minimum energy performanceposted by tiantian zhou on
Dear Sir, There is a project with a office tower ,a hotel tower above the fifth storeys and a commercial podium below the fifth storeys.
Existing building with extension
CS-2009 EAp2:Minimum energy performanceposted by Eleftherios Zacharakis on
Our project is an extension building that undergoes a major renovation on the HVAC-system and interior, but not exterior envelope, and even gets a new extension.
heat recovery system for base case ?
CS-2009 EAp2:Minimum energy performanceposted by shashank jain on
We are modelling our CS case in Sao Paulo (Climate 2A).
Core&Shell Process Load on a Manufacturing Facility
CS-2009 EAp2:Minimum energy performanceposted by Lourdes Salinas on
Hi everyone, We have a C&S Major Renovation Manufacturing Facility project. The building is doubling in size and some adjustments will be performed to the envelope of the existing building.