Forum quick links
% of Glazing & Floor Area Base Case vs Project
CS-2009 EAp2:Minimum energy performanceposted by Dana Guzman on
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.
Alternative compliance path: Core & shell 2009 EAp2
CS-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
I am working on a Core and Shell Project and I would like to use the calculator of alternative compliance path for reducing the percentage of saving needed to meet EA the prerequisite 2.
Site Lighting for Campus Plan
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
Hello, We have a campus application for our 3 mixed-use buildings. We are now on our final review and need to modify our submittal.
VRV in Table 1.4
CS-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Hello, I am filling out the Table 1.4 for an office building with mutiple tenants, and each tenant has a separate VRV to serve their space.
Lighting power densities for building exteriors
CS-2009 EAp2:Minimum energy performanceposted by Rosana Correa on
The maximum power allowance for building façades is 2.2 W/m2 for each illuminated wall or surface.
Process Loads
CS-2009 EAp2:Minimum energy performanceposted by Rodrigo Vazquez on
We are working on a project in Mexico City, to comply with the prerequisite 2 we are following Option 1, whole building energy simulation. In the first simulation we´d done of the energy model we c
DES -option2: virtual rate
CS-2009 EAp2:Minimum energy performanceposted by Johannes Gellrich on
Modeling a DES system after Option 2, we got the energy consumption and prices from the DES.
Site lighting calculations
CS-2009 EAp2:Minimum energy performanceposted by charles bell on
We have a campus projects with three relatively equal size multi-story buildings. The owner will manage the three buildings separately. Each project will pay for their own utilities.
Automated Demand Response
CS-2009 EAp2:Minimum energy performanceposted by Ryan McEvoy on
We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum energy performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.