Forum quick links
MPR, GFA and energy modelling
CS-2009 EAc1:Optimize energy performanceposted by Puteri Shireen Jahnkassim on
Dear All, In the LEED MPR, it states that carpark areas cannot be part of the calculated GFA of a project submitting for LEED.
SHGC for the whole window or just glass?
CS-2009 EAc1:Optimize energy performanceposted by Marco Abdallah on
Hi, i am working on a WBS according to App. G. Regarding the fenestration of the baseline building the ASHRAE states an SHGC of 0.4 (climate zone 5).
Defining the building type
CS-2009 EAc1:Optimize energy performanceposted by Rosana Correa on
Hi, I have a 6 floors/2000 m² nonresidential building, and I am not sure about the system it should be. Area or number of floors is more relevant when choosing a system?
Appendix G Oversizing
CS-2009 EAc1:Optimize energy performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove
tenant work: fan coils
CS-2009 EAc1:Optimize energy performanceposted by Johannes Gellrich on
Hello all, I'm working on a C&S project.
Update of the energy modelling for the construction review
CS-2009 EAc1:Optimize energy performanceposted by Juliette Barach on
Hi, I'm currently working on a LEED CS office building, and can't find a clear answer to my question in the LEED referential, user's guidance or standard: Do I need to update the energy modellin
Boiler Thermal Efficiency (%)
CS-2009 EAc1:Optimize energy performanceposted by Ciaran McCabe on
Is there a formula for calculating the Boiler Thermal Efficiency using HHV. Should the modeled boiler efficiency be seasonal taking into account part load conditions.
Ooptimize Energy Performance
CS-2009 EAc1:Optimize energy performanceposted by Paula Hernandez on
I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me, Thans
Conditioned Floor Area
CS-2009 EAc1:Optimize energy performanceposted by Sunil Kumar Anantharaman on
G 3.1.1 of Appendix G performance rating method mentions that Base Line building design shall be based on "usage, no.