Forum quick links
Cold C&S - No HVAC
CS-2009 EAc1:Optimize energy performanceposted by Scott Johnson on
We have a project that consists of a cold core and shell that will have warm lobby.
"Categorized as an Office Space"
CS-2009 EAc1:Optimize energy performanceposted by Aaron Frantz on
We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.
Can a shell be LEED Core and Shell certified without HVAC?
CS-2009 EAc1:Optimize energy performanceposted by Lawrence Lile on
I've cross posted this in the LEED CS fundamental commissioning discussion since these two issues seem to be the showstoppers. We are working on a project that is a tenant finish-out shell.
tenant work: fan coils
CS-2009 EAc1:Optimize energy performanceposted by Johannes Gellrich on
Hello all, I'm working on a C&S project.
Update of the energy modelling for the construction review
CS-2009 EAc1:Optimize energy performanceposted by Juliette Barach on
Hi, I'm currently working on a LEED CS office building, and can't find a clear answer to my question in the LEED referential, user's guidance or standard: Do I need to update the energy modellin
Appendix G Oversizing
CS-2009 EAc1:Optimize energy performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove
Ooptimize Energy Performance
CS-2009 EAc1:Optimize energy performanceposted by Paula Hernandez on
I am not sure how to estimate a Core & Shell lighting Schedule for an office building, would somebody help me, Thans
Conditioned Floor Area
CS-2009 EAc1:Optimize energy performanceposted by Sunil Kumar Anantharaman on
G 3.1.1 of Appendix G performance rating method mentions that Base Line building design shall be based on "usage, no.
I wonder how I should model a Ventilation system
CS-2009 EAc1:Optimize energy performanceposted by Ron Dean on
I wonder how I should model a Ventilation system to comply with Apendix G ASHRAE, it said that my proposed desing shall be consistent with design documens.. This is the description of my system: &g