Lighting measurement

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Ron Dean  on 

good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m

1
Mon Aug 27, 2012, 2:18 pm

Deciding to choose Option 1(D) or Option 2(B)

CS-2009 EAc5.1:Measurement and verification - base building
posted by  James Keohane  on 

I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.

1
Wed Nov 13, 2013, 2:31 pm

Quality Assurance

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Ciaran McCabe  on 

Can anyone help with the following LEED reviewer comment that we received.

1
Thu Apr 27, 2017, 1:08 pm

EAc 5.1 for LEED C&S

CS-2009 EAc5.1:Measurement and verification - base building
posted by  S Nagarajan  on 

Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.

1
Thu Nov 6, 2014, 11:04 pm
1
Mon Aug 16, 2010, 4:36 pm

Energy Model Calibration by Post Construction data

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Gabriela Hernández Castillo  on 

Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures.

1
Mon Jul 8, 2013, 6:37 pm

Sub Metering of Service Hot Water (Domestic Hot Water)

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Ciaran McCabe  on 

Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.

1
Fri Jan 8, 2016, 2:25 am

Tenant Submetering connected to BMS?

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Marco Abdallah  on 

We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.

1
Fri Aug 24, 2012, 12:58 pm

Separating lighting metering from plug load metering.

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Rudolph Carneiro  on 

I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.

1
Fri Oct 25, 2013, 1:22 pm

Model Calibration - Margins for Error

CS-2009 EAc5.1:Measurement and verification - base building
posted by  Ciaran McCabe  on 

For a new office building would it be acceptable to use these error margins for an M&V Report.

1
Fri Apr 21, 2017, 5:07 pm