CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ron Dean on
good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m
Deciding to choose Option 1(D) or Option 2(B)
CS-2009 EAc5.1:Measurement and verification - base buildingposted by James Keohane on
I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.
Quality Assurance
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ciaran McCabe on
Can anyone help with the following LEED reviewer comment that we received.
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and verification - base buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.
Energy Model Calibration by Post Construction data
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Gabriela Hernández Castillo on
Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures.
Sub Metering of Service Hot Water (Domestic Hot Water)
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ciaran McCabe on
Does Service hot water need to be sub-metered to satisfy this credit ? If not will it make the energy model more difficult to calibrate.
Tenant Submetering connected to BMS?
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Marco Abdallah on
We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.
Separating lighting metering from plug load metering.
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Rudolph Carneiro on
I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.
Model Calibration - Margins for Error
CS-2009 EAc5.1:Measurement and verification - base buildingposted by Ciaran McCabe on
For a new office building would it be acceptable to use these error margins for an M&V Report.