Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
IEQp1-tenant spaces
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Agnieszka Rylska on
We are working on a shopping mall project in whcih there will be many retail spaces. Some of the tenants will design their own ventilation systems and provide their own AHUs.
Locker/Dressing Rooms Exhaust into Parking Garage spaces
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Adriana Hansen on
I would like to know if is acceptable to design the exhaust outlet of locker/dressing rooms directly to a parking Garage space. We have an basement level with dressing rooms adjacent to a parking
Lease Agreement Example
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Heather Holdridge on
We have a LEED CS project where some ventilation systems are included in the tenant's scope of work, so I am working the owner to incorporate ASHRAE 62.1 compliance language into the lease agreemen
Areas to be considered
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Angela Saggin on
Hi! What areas/rooms should we consider inside an appartment for the calculation of naturally ventilated spaces?
CS vs EBOM
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Markievicz E on
Hi All We have an unusual project... Completed in 2008 but remaining unoccupied thought the 'crisis'.
Anticipated Tenant Fit Out
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Paula Hernandez on
Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo
Future Tenant Ventilation and Parking Garage Exhaust Volume
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Shenhao Li on
Dear All, Here I have 2 questions regarding IEQ P1: 1. We have a commercial bulding including a few retail shops. The HVAC systems in these shop will be done by future tenant.
C&S scope
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Rubén M. R. on
We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors.