Forum quick links
Tenant work and submittal of credits
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Lise Dannesboe on
I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.
Naturally ventilated spaces
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Nader NAKIB on
I appreciate your interpretations on the ASHRAE 62.1 regarding the requirement for naturally ventilated spaces: 5.1.1 Location and Size of Openings: Naturally ventilated spaces shall be permanentl
exhaust rate - garages
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Agnieszka Rylska on
ASHRAE 62.1-2007 requires specific exhaust rates for different space types in Table 6-4. For parking garages the requirement is 3.7 L/s/m2.
Ventilation strategy for rooms added after construction work
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
An office building that is being certified under LEED C&S will have 80% of its gross floor area without a complete interior fit-out at time of construction work completion.
Two buildings on one project site
CS-2009 IEQp1:Minimum indoor air quality performanceposted by James Lee on
Hi, I am James and am working on project with two buildings on one project site. In this case, should I fill out IEQp1 form separately like EAp2? Maybe someone already asked this question. But p
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Occupant Density - Filling out the IEQp1 form
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Ron Dean on
Hello, I have two specific questions, please help me working them out. 1.
Recilculation Class Air
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Luis Miguel Diazgranados on
Hi everybody, I am working in an office building project, core and Shell scope.
n/a
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
Project size increase
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Silvia Ruiz on
Dear all In a project that we are certificating LEED C&S v3 the owner has modified the OPRs, specificly the project size and the MEP system. 1.