Does an indoor sewage pit need exahust for EQc5?
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Kristopher Lashley on
We have a project where there is a sewage pit located on floor P2 of the parking garage.
MERV 13 for Make-up air?
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Esteban Martinez on
We have a Cafeteria-Restaurant space complying with 62.1 throughout an exhaust system with make-up air directly from the outside.
revolving doors and side entrances
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Agnieszka Rylska on
I am working on a project (shopping mall) that will have revolving door as the mail entrance and it will be equipped with a permanent walk-off system.
Entryways system disntance 10ft
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by gabriel Morales on
Hello, architecture according to our main lobby, meeting with the distance of 10ft mat we complicated for users coming from the parking lots. The design team has proposed installing a section of
Garage entrances to building
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Maria Isabel Conde on
Hi, We have a project with 7 parking floors. Every floor have an entrance with access to elevators and stairs. We want to know if that entrances should be closed.
no space for 10 feet long walk-off mats in cafes
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Adam Targowski on
Entryway walk-off systems at least 10 feet long will be installed in all regularly used entrances to the shopping mall we are working on.
n/a
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Mathilda Jonsson on
My project is an office building that will have entrance floor grills in its windage.
Cleaning contract for roll out mats
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by V. Miller on
LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided.
IEQc5 - MERV 13 Filtration
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by Patrick Nall on
Does anyone know if the requirements of this credit can be met with a split-system for an exercise room if the outdoor air ONLY has the MERV 13 filtration? There is no return air on the unit.
Walk-off mat system - Stone panels with a recess below.
CS-2009 IEQc5:Indoor chemical and pollutant source controlposted by myriam tschiptschin on
The project team of an office building is interested in using a new product called C/S Floorometry® 401 for the walk off mat: http: //www.c-sgroup.com/files/literature/Floorometry_0.pdf This is a f