Does an indoor sewage pit need exahust for EQc5?

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Kristopher Lashley  on 

We have a project where there is a sewage pit located on floor P2 of the parking garage.

1
Tue May 26, 2015, 1:34 pm

MERV 13 for Make-up air?

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Esteban Martinez  on 

We have a Cafeteria-Restaurant space complying with 62.1 throughout an exhaust system with make-up air directly from the outside.

1
Wed Jul 24, 2013, 6:27 pm

revolving doors and side entrances

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Agnieszka Rylska  on 

I am working on a project (shopping mall) that will have revolving door as the mail entrance and it will be equipped with a permanent walk-off system.

1
Sat Jun 18, 2016, 1:59 pm

Entryways system disntance 10ft

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  gabriel Morales  on 

Hello, architecture according to our main lobby, meeting with the distance of 10ft mat we complicated for users coming from the parking lots. The design team has proposed installing a section of

1
Fri Jul 13, 2012, 5:34 pm

Garage entrances to building

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Maria Isabel Conde  on 

Hi, We have a project with 7 parking floors. Every floor have an entrance with access to elevators and stairs. We want to know if that entrances should be closed.

1
Tue Nov 4, 2014, 9:24 pm

no space for 10 feet long walk-off mats in cafes

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Adam Targowski  on 

Entryway walk-off systems at least 10 feet long will be installed in all regularly used entrances to the shopping mall we are working on.

1
Tue Jan 29, 2013, 2:49 pm

n/a

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Mathilda Jonsson  on 

My project is an office building that will have entrance floor grills in its windage.

1
Wed Apr 15, 2015, 3:50 pm

Cleaning contract for roll out mats

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  V. Miller  on 

LEED User credit checklists for this credit indicate that a copy of the cleaning contract must be provided.

1
Thu Feb 24, 2011, 1:44 pm

IEQc5 - MERV 13 Filtration

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Patrick Nall  on 

Does anyone know if the requirements of this credit can be met with a split-system for an exercise room if the outdoor air ONLY has the MERV 13 filtration? There is no return air on the unit.

1
Sun Jul 21, 2013, 4:46 pm

Walk-off mat system - Stone panels with a recess below.

CS-2009 IEQc5:Indoor chemical and pollutant source control
posted by  myriam tschiptschin  on 

The project team of an office building is interested in using a new product called C/S Floorometry® 401 for the walk off mat: http: //www.c-sgroup.com/files/literature/Floorometry_0.pdf This is a f

1
Sat Sep 1, 2012, 7:52 pm