Forum quick links
Forum
Topic
Replies
Recent
4
Thu Jun 9, 2022, 4:08 pm
Different Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
Greetings!..
3
Tue May 17, 2022, 1:31 pm
LEED Credit impact - On site electricity provision from LPG
NC-v4 EAp2:Minimum energy performanceposted by Robert Yates on
Hi
1
Mon May 23, 2022, 8:17 pm
EPA LEED CHP Calculator?
NC-v4 EAp2:Minimum energy performanceposted by Erin Holdenried on
Has anybody used the EPA LEED CHP Calculator on a LEED project? As the the name suggests, it was made specifically for LEED projects (though it states for early assessment only). W
1
Wed Jun 29, 2022, 2:35 pm
Firing Range ventilation process loads
NC-v4 EAp2:Minimum energy performanceposted by jorge velasco on
I am currently working on an energy model for a Firing Range building which will pursue V4 BD+C New Construction.
0
Option 3 without tenant meters
NC-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
Hi All,
We are conducting feasibility study on an existing building in which we are changing chillers. And we are planning to comply under Option 3: Historical Data
2
Fri Apr 29, 2022, 3:02 am
Off Site Renewable Energy Purchase
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
2
Thu Apr 14, 2022, 7:04 pm
Baseline Design Supply Airflow Rate Temperature Difference 90.1-10 para. G3.1.2.9.1
NC-v4 EAp2:Minimum energy performanceposted by Michael Callan on
Hello,
1
Tue Apr 12, 2022, 1:47 pm
ASHRAE Standard 90.1 - 2016 in LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Greenlab on
Dear all,
5
Mon Mar 28, 2022, 6:36 pm
Baseline Case Outdoor Air Modeling
NC-v4 EAp2:Minimum energy performanceposted by Mankisha Veng Veng on
Dear Concern:-
3
Mon Mar 21, 2022, 4:17 pm