ASHRAE 90.1-2010 VRF Requirements
NC-v4 EAp2:Minimum energy performanceposted by Rudolph Carneiro on
Does anyone know wether or not evaporator input power should be included in the efficiency calculation of a VRF system?
90.1-2007 G3.1.1 exception d vs 90.1-2010 exception c
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Exception c requires that lab spaces use a system 5 or 7 in the same way that exception d does, but exception c does not prescribe any specific turn down during unoccupied periods.
Data Center Calculator
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
For Data center project, I've supplied the designer team with the Data Center Calculator, so that they'd be able to fill it in with their project data. However, There are some questions in relation
insulation thickness versus energy modeling
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Webb on
We are running into a situation where the insulation is slightly under the R38 (R34.8) that is required per ASHRAE 90.1 yet the energy model shows we are over 10% energy efficient.
Air Barrier for Existing Building
NC-v4 EAp2:Minimum energy performanceposted by Martin Meehan on
Hi all, This query follows on a similar theme to the previous topic. We are working on an existing building that is intending to improve the envelop performance by internally adding insulation to
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.
Is this plant qualified as a DES?
NC-v4 EAp2:Minimum energy performanceposted by Aru Sau on
1. We registered the project as Campus consisting 3 Buildings. Central Plant Building and the future building is not included in the LEED boundary. 2.
District Energy Systems
NC-v4 EAp2:Minimum energy performanceposted by Bob Crowell on
Marcus or anyone who knows the answer, I have a squash facility that is being added on to an existing building. The LEED Boundary does not include the plant. 1) The existing plant serves only one
Energy modeling for LEED BD+C: Core & Shell
NC-v4 EAp2:Minimum energy performanceposted by Hanh Truong on
Dear all, We have a project targeting LEED BD+C: Core & Shell. My question is how to model whole-building energy simulation?
occupancy sensor in big offices
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Does it mean that for bigger offices (i.e.