Forum quick links
Overhangs and light transmittance vrs daylighting
CI-v4 EAp2:Minimum energy performanceposted by Gustav Alfaro on
Hi everyone, This office tenant space is located in a building with large overhangs and the visible transmittance through the windows is poor, we ran daylight simulations and it seems that the lig
Lighting steps vs on/off
CI-v4 EAp2:Minimum energy performanceposted by Jorge Lopez de Obeso on
Hello everyone, I am currently working on a LEED for CI v4 project.
ENERGY STAR - only newly purchased eligible products?
CI-v4 EAp2:Minimum energy performanceposted by Joanna Switzer on
Not seeing this qualified in the Reference Guide, but hoping someone can verify this is still the same as in 2009 CI....the pre-req compliance (and elective credit points under Optimize Energy) is
Modeling Office Space in an Existing High Rise Building
CI-v4 EAp2:Minimum energy performanceposted by Annie Argento on
We're using eQuest to model a tenant improvement office space, which is about half of one story in a 28 story high rise office building in LA.
Daylight controls
CI-v4 EAp2:Minimum energy performanceposted by Gabriela Crespo on
Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate.