Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Multitenant Building

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sofia Barahona  on 

We are currently carrying out the feasibility study for the certification of an existing project in Operation and Maintenance v4.1: Existing Buildings.

3
President & Engineer
Gaia Blueprint
LEEDuser Premium Member
1 thumbs up
Mon Oct 13, 2025, 4:17 pm

Lighting Boundary if property boundary abuts parking spaces off of a public roadway?

NC-v4 SSc6:Light pollution reduction
posted by  Crista Shopis  on 

Hi, my project abuts a parking lot that is basically an expanded shoulder with spaces, directly off of a roadway.

3
Default Avatar
Senior Engineer, LEED AP
Taitem Engineering
LEEDuser Premium Member
6 thumbs up
Wed Oct 8, 2025, 7:27 pm

Contaminated Soil

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Magdalena Kolodziej Rivas  on 

If a project has a small area of contaminated soil, how should that be incorporated into the Waste Management and Erosion and Sedimentation Plan.  

0

LCA: is waste % required?

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Alexandra Kravel  on 

I'm curious if % of materials waste is typically included in the LEED LCA analysis? Not seeing a specific language for it on the LEED guide.

0

What happened to VOC content?

Mid-Rise-v4 EQc7:Low-emitting products
posted by  Michelle Rosenberger  on 

In the 2008 MFMR system, VOC content was under the material credit Environmentally Preferred Products. Now in v4 there is Low Emitting but it doesn't include VOC content just emissions.

0

Modeling Process Hot water

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi, I am working on a test and reliability manufacturing facility, where we are using close to 65,000 gals of water for process load, what should be a good assumption to figure out how much of that

0

Pilot Credit LTpc134 - Advanced Transportation Monitoring Systems Pilot credits

CS-v4 INc1:Innovation
posted by  Adriana Hansen  on 

For the Advanced Transportation Monitoring Systems pilot credit, do we need to count only people tracked through access control (turnstiles), or also visitors who just stay in the lobby or

0

Office space only going for partial renovation.

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  shashank gangil  on 
We have a client who lease out three floors in a office building in Hong Kong. They are currently renovating a part of these three floors.
11
Tue Sep 30, 2025, 9:33 am