Reduced Truck Idling Documentation
Warehouses-NC-v4 LTc8:Green vehiclesposted by Szymon Zwoniarkiewicz on
Dear all,
Points in Addition to Renewable Energy Production?
NC-v4 EAc2:Optimize energy performanceposted by Dianne Herrin on
Hi - Our solar PV system is adding two points to our "optimize energy performance" category due to the cost offset.
Electrical Commissioning Scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Renee Azerbegi on
We have several clients who are implementing LEED v4.
Indoor Lighting Quality in LEED v4 BD+C Hospitality projects.
Hospitality-NC-v4 EQc6:Interior lightingposted by Susan Di Giulio on
Hi,
I have a few hotels working their way through LEED v4. I understand that Guestrooms should not be counted for Option 1; lighting controls.
Satisfaction of the authority
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
Dear all, can anyone explain "satisfaction of the authority"? Under German law the property owner is obligated to remediate all contaminations.
Option 2 - Leadership Extraction Practices
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
How can structure and shell only be allowed to contribute towards 30% of the compliant building material cost, when 25% is enough to fullfil this credit?
Additional scope to test...what if there is no contamination found?
NC-v4 LTc3:High priority siteposted by emily reese moody on
We have a project that is not required to do site contamination testing, and does not believe there is any reason for the site to have contamination (they have always owned the site), so they did n
Outdoor Ice Rink Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Ralph Bicknese on
We are looking at LEED for a multi-purpose sports facility with indoor space and an outdoor ice rink that is not enclosed.
Group or single project for Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces
62 2010 MZ Calc excel for LEED v 4.
CI-v4 EQp1:Minimum indoor air quality performanceposted by Sadaf Alam on
Hi ,
Does anyone have 62 2010 MZ Calc excel for LEED v 4.