Forum quick links
Integrated dryer and Water Sense labeled faucet
NC-v4 WEp2:Indoor water use reductionposted by Elizabeth Floyd on
If none of the systems with integrated sink/faucet and hand dryer are available with a Water Sense labeled faucet, does that make the product ineligible for Water Sense labeling?
Representative Measurements
CS-v4 EQc4:Daylightposted by Summer Minchew on
Similar to how we would address views in a core and shell project, can Option 3 measurements be conducted based on a representative floor plan(s) or would measurements need to be conducted for the
SCAQMD Exempt Compounds
CI-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
SCAQMD Rule 1113 exempts compounds that are packaged in small containers under 1 liter. We have some sport court coatings that do not meet VOC compliance but will fall under that exemption.
List of active Innovation credits?
NC-v4 INc1:Innovationposted by RDK E&S on
I'm looking for a list of active v4 BD+C Innovation credits to sort through. All the links I've found via Googling aren't active / are broken. Does anyone have a current working link?
FTE for Assisted Living Facility
NC-v4 WEp2:Indoor water use reductionposted by on
I am working on a 99 room/6 story assisted living facility in Newport Beach, CA. The LEED-BD&C v4.0 Reference Guide provided fairly straightforward instructions for determining the "
Land Trust Alliance Alternative
NC-v4 SSc2:Site development - protect or restore habitatposted by Ashley Wisse on
The project is on a campus that contains a large bird sanctuary that is managed by the Owner, which is open to the public for passive recreation. This wildlife sanctuary is not part of the La
Question on Table 6.5.3.1.1B of ASHRAE 90.1-2010 - How is prssure drop of the Air Heat recovery system of the base calculated?
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Please give me a feedback if I have calculated right the Fan Power of the baseline building.
Control of Energy Recovery System in the Baseline Building: Is an Economizer required or not?
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear Leed users,
Baseline building based on ASHRAE 90.1-2010:
seperate control of presentation walls in small rooms
NC-v4 EQc6:Interior lightingposted by Benjamin Weise on
Hi! There are big medium and small meeting rooms featuring presentation walls. They all have direct lighting from above the tables.
Multiple mode
Retail-NC-v4 EQc6:Interior lightingposted by Francesco Passerini on
In the form in leedonline for Sales areas lighting controls as "Lighting Control Type" the option "Multiple mode" is present. What is the definition of Multiple mode?
Regards