Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

100% Greenfield Site

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Sofia Barahona  on 

If we are designing a project on a 100% greenfield land, therefore no previously developed area is present.

1
Wed Sep 2, 2020, 11:01 pm
1
Tue Sep 8, 2020, 7:23 pm

In an open office space, how to distinguish whether the type of workstation meets the definition of permanent indoor obstruction

NC-v4 EQc8:Quality views
posted by  Jingchao Qian  on 

There are questions about the quality view of open-plan office spaces. Vision types 1 and 3 require no permanent indoor obstructions. Refer to example 3 in the reference.

0

MDE's simple equation for estimating surface area

CS-v4 SSc4:Rainwater management
posted by  Erkki Seinre  on 

I came across a video about treatment area calculation on USGBC website: 

0

Rc value

NC-v4 EAc6:Enhanced refrigerant management
posted by  Lise Dannesboe  on 

Hi

To caluclate the Rc-value we need to know the amount of refrigerant and the cooliing capacity. As LEED v4 puts it:

3
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Jan 8, 2020, 11:04 am

Bicycle Network Connections

NC-v4 LTc6:Bicycle facilities
posted by  Michelle Rosenberger  on 

This must be obvious to everyone but me since I don't see a question on this. Our project is adjacent to a well established bike trail that extends for 10 miles or more in both directions.

4
Tue Jan 7, 2020, 7:54 pm

Using ASHRAE 90.1-2013 as reference standard for v4 projects

NC-v4 EAp2:Minimum energy performance
posted by  Gail Vittori  on 

Has there been an equivalency established for LEED v4 projects that use ASHRAE 90.1-2013-Appendix G as reference standard (as there was for LEED 2009 projects that used ASHRAE 90.1-2010-Appendix G

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jan 7, 2020, 6:32 pm
4
Executive Associate - Lead Design
Rushing Air Treated Air Systems
LEEDuser Basic Member
0 thumbs up
Sun Jan 5, 2020, 3:34 pm

Extrapolate daylight results for similar floors

NC-v4 EQc7:Daylight
posted by  Agnieszka Kaczmarek  on 

Illuminance simulations should be perform for all the regularly occupied spaces. What if I have 20-storeys building with same geometry and same layout?

3
Sat Jan 4, 2020, 4:12 am