100% Greenfield Site
NC-v4 SSc2:Site development - protect or restore habitatposted by Sofia Barahona on
If we are designing a project on a 100% greenfield land, therefore no previously developed area is present.
LEED v4 CI information
CS-v4 SSc7:Tenant design and construction guidelinesposted by Jamie Oates on
Hi all,
In an open office space, how to distinguish whether the type of workstation meets the definition of permanent indoor obstruction
NC-v4 EQc8:Quality viewsposted by Jingchao Qian on
There are questions about the quality view of open-plan office spaces. Vision types 1 and 3 require no permanent indoor obstructions. Refer to example 3 in the reference.
Rc value
NC-v4 EAc6:Enhanced refrigerant managementposted by Lise Dannesboe on
Hi
To caluclate the Rc-value we need to know the amount of refrigerant and the cooliing capacity. As LEED v4 puts it:
Bicycle Network Connections
NC-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
This must be obvious to everyone but me since I don't see a question on this. Our project is adjacent to a well established bike trail that extends for 10 miles or more in both directions.
Using ASHRAE 90.1-2013 as reference standard for v4 projects
NC-v4 EAp2:Minimum energy performanceposted by Gail Vittori on
Has there been an equivalency established for LEED v4 projects that use ASHRAE 90.1-2013-Appendix G as reference standard (as there was for LEED 2009 projects that used ASHRAE 90.1-2010-Appendix G
Chilled Water rinsing / cleaning - How to ensure safe disposal ?
NC-v4 SSp1:Construction activity pollution preventionposted by Amine Zeidane on
Hello LEED Community,
LEED Boundary - Police Training Facility
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Josie Plaut on
Hi,
Extrapolate daylight results for similar floors
NC-v4 EQc7:Daylightposted by Agnieszka Kaczmarek on
Illuminance simulations should be perform for all the regularly occupied spaces. What if I have 20-storeys building with same geometry and same layout?