Students (K-12) in ocupancy table for WE calcualtions
Schools-NC-v4 WEp2:Indoor water use reductionposted by Micaela Smulevich on
BPDO EPD Construction process Submittals
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Chyanne Husar on
We work with architects and contractors to prepare their LEED documentation and our projects require a separate LEED submittal process from Contractor to AOR. On the contractor side, we are s
planters on terraces
NC-v4 WEp1:Outdoor water use reductionposted by Agnieszka Rylska on
Can anyone confirm if planters located on the terraces should be included in the calculations for this credit?
roof under ventilation ducts and glass overhang
NC-v4 SSc5:Heat island reductionposted by Agnieszka Rylska on
I have two questions regarding heat island reduction credit:
Location of the recycling bins
Retail-CI-v4 MRp1:Storage and collection of recyclablesposted by Ricardo Filho on
Hi all;
I have a project at concept phase and we are determining the location of the bins;
Documentation Required for IP Credit
Schools-NC-v4 IPc1:Integrative processposted by Cora Kenrick on
Hi Fellow LEED Users,
Has anyone submitted this credit yet and what documentation is required.
I'm new to LEED and this credit.
Exterior Lighting control for 24x7 operating building
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We have a commercial building which is 24x7 operating.
Default Emissions Factors & Carbon vs Electricity
CI-v4 EAc6:Green power and carbon offsetsposted by Tracy Marquis on
I have two questions.
Timing of Installation and Commissioning
NC-v4 EAc5:Renewable energy productionposted by Michaella Wittmann on
The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy.
Flush for Residential Multifamily several stories
NC-v4 EQc4:Indoor air quality assessmentposted by Sue Bryant on
The reference guide states that "If multiple, discrete HVAC systems operate independently, the team may flush out portions of the building as work is completed in each area served by a given system