Heat Recovery Exceptions - Baseline Adjustments
NC-v4 EAp2:Minimum energy performanceposted by RDK E&S on
Hi, I'm working on a 2-story 140,000 sf manufacturing facility and wanted some feedback on how to best set up the Baseline. The facility is compromised of a significant amount of office, wareh
CxA Role - Limited central plant installed
CS-v4 EAc1:Enhanced commissioningposted by Ciaran McCabe on
Envelope Cx Testing
NC-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
I'm working on a project with envelope commissioning. It is a large data center type building.
Recomendations when Selecting Air-Conditioning Equipment to Maximize Credits
NC-v4 EAc2:Optimize energy performanceposted by Josh Beauchemin on
Hi everyone,
7.6.1.2 Extracting Fan Power – Baseline Design
NC-v4 EAc2:Optimize energy performanceposted by Amal Venugopal on
Hi Sir,
Greetings!
The following content is copied from,
Ventilation in Corridors
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sofia Barahona on
We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite.
Innovation Credit: Walkable Project Site
CI-v4 INc1:Innovationposted by Patty Lloyd on
The base building achieved this, which was seeking LEED v3 CS. At that time it was pilot credit SSpc14.
Exceptional Calculation Method /Ashrae Appendix G2.5
NC-v4 EAp2:Minimum energy performanceposted by Benjamin Weise on
Hello,
recyclable storage area outside the boundary
NC-v4 MRp1:Storage and collection of recyclablesposted by Larissa Murakami on
Would it be possible to use an area outside the boundary for the recyclable storage area?