Forum quick links
Using EMS to calculate some End-Use Energy
NC-v4 EAc3:Advanced energy meteringposted by Melissa Crowe on
Hi All
We have metering set up for most of the end-uses that represent over 10% of total energy but for some equipment is it not cost effective or practical.
Option 2 - Is there still a minimum sample area requirement?
NC-v4 EQc4:Indoor air quality assessmentposted by Daniel Smith on
I am quoting to provide Option 2 IAQ testing for my first V4 BD+C project.
Manufacturing Plant Energy Consumption
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are working on a project that is pursuing LEED v4: New Construction.
Walkable Project Site
NC-v4 INc1:Innovationposted by Rebecca Aarons-Sydnor on
We are looking at this for a building that is on a plaza and next to green space (athletic field) and a body of water (lake). There is only pedestrian and bike access to the building via the
Reasonable LEED Boundaries
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Marlen Aleman on
Hi, the scope of the project is to renovate the 3rd floor of a 5 storey building (all floors will be renovated eventually but the client wants to certify each floor as we go).
LEED online and simulation file
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Dear Leedusers,
I was wondering: At pltaform LEED online is it asked to upload the original output file from the energy simulation software in native format?
Door closer and door stopper
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Claudia Sturcz on
Dear All,
Infra-red electronic basin mixer
CS-v4 WEp2:Indoor water use reductionposted by Hatice G. on
Dear all,
ASHRAE 5.4.3.4 vestibules
NC-v4 EAp2:Minimum energy performanceposted by Agnieszka Rylska on
Section 5.4.3.4 of ASHRAE 90.1-2010 requires enclosed vestibules at building entrances ("Building entrances that separate conditioned space from the exterior shall be protected with an enclosed ves