Baseline: Data Center HVAC system
NC-v4 EAp2:Minimum energy performanceposted by Marica Marzari on
Hi All,
I'm modeling a Data Center that include Data Hall, offices, workshops and a lot of technical rooms.
How can I model the Baseline HVAC system? Because:
Metering Requirements
CI-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All,
We’re currently trying to certify a project with the following characteristics:
Hair washing sinks in a hair-salon
CI-v4 WEp1:Indoor water use reductionposted by Robin Dukelow on
Hello, I am wondering if a hair washing sink/spray valve are considered process water and excluded from the Indoor Water Use Calculator, or if they should be included. Thanks!
SMACNA guidelines
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Is it compulsory to follow all SMACNA guidelines to achieve this credit? or you can leave out a few and still earn the credit?
what is the international standard for air filters?
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
The CEN - EN 779 for air filter performance is currently inactive?
CIAQ before occupancy change
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Why was Construction Indoor Air Quality Management Plan - Before occupancy changed to Indoor Air quality Assessment?
Vertical Garden / Green Wall - qualified for vegetation requirement?
CS-v4 SSc3:Open spaceposted by Ronnel Flores on
Our project proposes a green wall to be planted with appropriate vegetation and climbers.
Does the LCA must cover the 100% of building envelope and structural elements?
NC-v4 MRc1:Building life-cycle impact reductionposted by Sara BENAYYAD on
To earn the 3 points on this credit, Question 1: Do I need to know life cycle analysis for 100% of my structural and envelope products? Even small products like tightness, ...?
Can a project have a different CxA for Fundamental and Enhanced Commissioning?
CI-v4 EAc1:Enhanced commissioningposted by Renee Shirey on
Our project went forward with Fundamental Commissioning using a member of the Engineering firm (disinterested party, not involved in any way with the design/engineering/construction of the building
construction indoor air quality management plan
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Why was the construction IAQ management during construction and before occupancy from LEED 2009 combined to one credit Construction Indoor Air quality Management Plan in LEED v4?