Forum quick links
Whether or not to include certain existing fixtures within the area of work
CI-v4 WEp1:Indoor water use reductionposted by Bo White on
Our area of work includes portions of the first and second floors of a university library in California. On the first floor, only bathrooms are included.
Standard bus stop - weekday vs weekend
NC-v4 LTc5:Access to quality transitposted by Felicia Ridgeway on
Can a standard bus stop count if it is within 1/2 mile of the project entrance, or is a standard (non rapid) bus stop only allowed to count towards the 1/4 mile distance credit?
Occupant Comfort Survey
NC-v4 INc1:Innovationposted by Leanne Conrad on
Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey?
Space types and visitors to be surveyed
EBOM-v4 LTc1:Alternative transportationposted by Jorge Lopez de Obeso on
Hi, in an offices building visitors must be surveyed? The building has sporadic events in common spaces and the visitors rate is irregular.
Residential Dwelling - Min IAQ Calculator Strategy
NC-v4 EQp1:Minimum indoor air quality performanceposted by RDK E&S on
Hello,
LEED V4 ID+C
Retail-CI-v4 EAp2:Minimum energy performanceposted by Neeraj Sharma on
The Project is a small office of area around 360 Sq.m in huge building of area around 7400 sq.m? The office building is served by central chiller & no heating.
Mandatory Provision for Lighting Controls C&S
CS-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile.
Modeling baseline with System 2 of proposed hotel building with system 8
CS-v4 EAp2:Minimum energy performanceposted by Natalia Quintanilla on
Hi,