Forum quick links
EPA CGP 2003/2012
NC-v4 SSp1:Construction activity pollution preventionposted by Charalampos Giannikopoulos on
Hi all! Is anyone aware of a table summarizing the changes that were introduced by EPA CGP 2012 when compared to the 2003 version?
Entryway systems in airports
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Ricardo Sá on
Hi,
Historic Building Modeling for LEED
NC-v4 EAc2:Optimize energy performanceposted by Sarah Gudeman on
Okay, have a dormitory building renovation project that includes the following:
Can an outdoor mall entrance courtyard count towards the 30% open space requirement?
NC-v4 SSc3:Open spaceposted by B. Guzman on
Can an outdoor mall entrance courtyard count towards the 30% open space requirement, providing 25% of vegetated areas using planters and accomodating benches for outdoor social activities?
Unfinished space - Cafeteria
NC-v4 EAp4:Fundamental refrigerant managementposted by Ricardo Sá on
Hello,
Sealant Tape Adhesive Volume?
NC-v4 EQc2:Low-emitting materialsposted by RDK E&S on
Forgive my ignorance here, but how does LEED v4 handle sealant tapes?
Conference / Event Attendees: restroom usage rates
EBOM-v4 WEc2:Indoor water use reductionposted by Dan Ackerstein on
Does anyone have any vetted restroom usage rates for conference / event attendees?
Filtering Water in Cooling Tower Basin opposed to Filtering Makeup Water
NC-v4 WEc3:Cooling tower water useposted by Alyssa Faircloth on
Our project is an apartment building with retail and utilizes its own chiller plant with cooling towers.
Shower Requirement
CI-v4 LTc4:Bicycle facilitiesposted by Laura Eubanks on
Does the shower and changing facility have to be located in the building being certified or can it be located in a nearby building?