Forum quick links
2 Issues
EBOM-v4 EQc7:Green cleaning - products and materialsposted by José Solis on
I have two issues related to this credit that I need clarification on. 1) I am trying to use this credit as an innovation credit for a LEED C&S v2009.
Documenting Similar Regularly Occupied Spaces
NC-v4 EQc8:Quality viewsposted by Heather DeGrella on
If the project we are working on has similar spaces (e.g.
Central Plant Water Metering and Subsystems
NC-v4 WEc2:Indoor water use reductionposted by Craig Flandermeyer on
Our building is part of a campus with a central utility plant which delivers domestic hot and cold water (along with heating hot/cold water). The best/only opportunity to meter process w
Quality Views in Non-Regularly Occupied Spaces Pilot
CI-v4 INc1:Innovationposted by Juliana Moreira on
We have submitted evidence for this credit for an open plan office project in London.
Paint Storage
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Summer on
Does paint storage room is included in the requirement of interior-cross contamination prevention requirement?
we c1
NC-v4 WEp1:Outdoor water use reductionposted by Maria Peralta on
Hello!
I have an enquiry regarding this credit.
usgbc leed online site very slow and times out
NC-v4 MPR1:Must be in a permanent location on existing landposted by Christopher Cowie on
why is the usgbc leed online site so slow? I can bearly work on line and the site keeps timing out.
Option 3, Exterior wall repair and repointing
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged. Since repair isn't necessarily considered replacement, which
Thermal storage and Optimize Energy Performance
NC-v4 EAc2:Optimize energy performanceposted by Stephan Zweig on
Hell to all LEED users,
We are examininig to implement in out project a ice thermal storage systems.
The charges during the the night are better than during the day.
Lighting group control for On/Off/Mid Lighting control requirement
NC-v4 EQc6:Interior lightingposted by Thomas Tan on
Dear LEEDusers,
We have a project with a manufacturing space to pursue the Interior lighting control credit. Dimmers for task lights is not acceptable as safety issue.