Forum quick links
E-Jeepneys
NC-v4 LTc5:Access to quality transitposted by Summer on
Does E-Jeepney transpo counted on this credit? I haven't seen any explanation on the reference guide regarding electric transpo.
Recycling treated lumber or plywood?
NC-v4 MRp2:Construction and demolition waste management planningposted by Renee Shirey on
Has anybody found a way to recycle/divert plywood or other engineered wood? I think I've read enough things to understand that once lumber is treated with chemicals, it isn't a material to be
LEED ND v4 Pilot Credit Integrative Process - Participation in the Forum
ND-Plan-v4 INc1:Innovationposted by Charlotte Bodnar on
As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.
Light Pollution Reduction for Multiple buildings
NC-v4 SSc6:Light pollution reductionposted by Amal Venugopal on
Hi,
Are Vision Strips Included in Low-Emitting Materials?
CI-v4 EQc2:Low-emitting materialsposted by Diana Smiciklas on
Can 3M vision strips be excluded from the low-emitting materials calculations?
Following Strategy A but no D for regularly occupied space
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle
CI-v4 LTc3 - Access to quality transit - Question about "Bus Rapid Transit"
CI-v4 LTc3:Access to quality transitposted by Don Blair on
If a lane in a public street is signed with the wording "Bus Lane Ahead" and "Bus Lane" (those phrases are written on the pavement) but cars are not technically prohibited from&
IN vs. Exemp Performance Documentation Review
NC-v4 INc1:Innovationposted by Tracy Jordre on
We would like to wait until the Prelim Construction Submittal to submit our Innovation credits for review. In our preliminary design submittal, we did not mark the Innovation credit as “ready