Forum quick links
Metering make-up water for geothermal system
NC-v4 WEc4:Water meteringposted by Daniel Davis on
We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?
Demand Control Ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
Natural Land Cover conditions, option 2
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
I have some questions regarding SS C4 Rainwater Management: Natural Land Cover conditions, option 2.
balconies and heat island reduction
CS-v4 SSc5:Heat island reductionposted by Sareet Benayahu on
hello, our project has a large balcony on the second floor of the building.
Baseline systems exception: A system for the kitchen in all electricity heating source
NC-v4 EAc2:Optimize energy performanceposted by Mohamed Elagiry on
if we have system 6 as The main system which has the electricity as the main heating source, we have an exception for the kitchen according to G3.1.1 b which state to use system 5 or 7 for the
Integrative process charrette and ANSI book
NC-v4 IPc1:Integrative processposted by Kavita K on
Hi all,
We are pursuing a LEED for Schools project and are looking to get the Integrative process credit. Couple of clarifying questions -
Sky garden in refuge floor
CS-v4 SSc2:Site development - protect or restore habitatposted by Yoyo Shek on
Hi All,
surrounding density
CS-v4 LTc4:Surrounding density and diverse usesposted by Hatice G. on
Dear all,
how can I figure out the surrounding density?