Forum quick links
Employee parking lot with paid parking
NC-v4 LTc7:Reduced parking footprintposted by Andrée Iffrig on
We're having a debate about how the reduced parking credit applies to a large building serving as a lab. Parking offsite is being constructed with more than 500 spaces dedicated to staff.
Informal Transit...
EBOM-v4 LTc1:Alternative transportationposted by Shakir Ismail on
Hi,
Struggling to find options for alternative transportation for a planned LEED EBOM project in Qatar :S
Typo in View Factor Chart
NC-v4 EQc8:Quality viewsposted by Chris Edmonds on
In the reference guide the table reads the gray-zone range between preliminary view factor 4 and 5 is "40-30". This is a typo and should be corrected to "40-50".
How to control the maximum number of cycles of the cooling tower?
NC-v4 WEc3:Cooling tower water useposted by Yoyo Shek on
Hi All,
How do we control the maximum number of cycles of the cooling tower?
Baseline for CI when the CS certification is being carried out simultaneously
CI-v4 EAp2:Minimum energy performanceposted by Sansiago Velez on
This project is a CI fit out for 100% of the leasable floor area of the base building, which is currently being certified as Core and shell.
Previously developed land
Warehouses-NC-v4 LTc2:Sensitive land protectionposted by Prakash Sekar on
Location: Malaysia
Project type: Warehouse
How to control the maximum number of cycles of the cooling tower?
NC-v4 WEc3:Cooling tower water useposted by Yoyo Shek on
Hi All,
How do we control the maximum number of cycles of the cooling tower?
Is it by controlling bleed off rate and make-up water rate?
Thanks in advance!
Laminating adhesives in composite wood assemblies
NC-v4 EQc2:Low-emitting materialsposted by Craig Graber on
Does the "Composite Wood Evaluation" address shop-applied laminating adhesives used in composite wood assemblies like millwork? I've searched this forum, Ref.
ASHRAE 90.1 compliance within tenancy areas
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
we are applying LEED BD+C v4 Core & Shell to a large office building. Scope of Core & Shell works inside tenancy areas: