Forum quick links
Option 3. building and material reuse
CS-v4 MRc1:Building life-cycle impact reductionposted by Guillaume Rose on
Hi,
I would like to know how to count the surface of material reused.
1/4 mile radius cuts through buildings....
NC-v4 LTc4:Surrounding density and diverse usesposted by Alara Brinton on
If the edge of my 1/4 mile radius cuts halfway through a building, should I only be counting half the area of the building in my calculations or can I include the whole building?
Bikeshare Programs
NC-v4 LTc6:Bicycle facilitiesposted by Allison Wilson on
Has anyone had experience in a LEEDv4 project using bikeshare networks as a way to reduce the number of bicycle storage spaces that must be incorporated within a project?
1/4 mile radious from building boundary
CI-v4 LTc2:Surrounding density and diverse usesposted by ERM Korea on
Hello! I would like to ask about the 1/4 mile radius from building boundary. I have already read the article on FAQ and the one which Emily wrote, but I have a small confusion on it.
About Virtualized average server utilization (%)
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by DAVE LI on
Hi Everybody,
When I was trying to fill out the Minimum Energy Performance Data Center Calculator, I was confused about ''Virtualized average server utilization (%)''.
Environmental Impact Assessment (EIA) reports used for SSc: Site Assessment
NC-v4 SSc1: Site assessmentposted by Asil Rashid on
Hi ,
Furniture built with salvaged trees
NC-v4 EQc2:Low-emitting materialsposted by Alara Brinton on
We have several furniture items that are being built for our new office from salvaged trees around our city that would otherwise be destroyed (dutch elm disease).
Heat Island credit much easier?
NC-v4 SSc5:Heat island reductionposted by Elizabeth Powers on
Is anyone else finding this combined heat island credit much easier to get than expected? Given that the thresholds were raised for non-roof paving SR, I understood that additives to lighten
Entire building vs. parts of the building within scope of work
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
In NYC, there is building that the clients are looking to see if it complies with undergoing LEED certification under a Local Law. They pretty much ask for what could be included in the scope