NC-v4 EQc2:Low-emitting materialsposted by Irene Chung on
Hi,
Can anyone please confirm if form release compounds need to meet both VOC limits and emissions requirements? If so, does anyone know of any compliant product?
Is it possible to earn the credit with a parking garage in the underground floors?
NC-v4 LTc7:Reduced parking footprintposted by Benjamin Weise on
Hello! I am new to the topic and wondering if the project I am working on can achieve this credit.
Master site development consideration
NC-v4 SSc4:Rainwater managementposted by soha yamani on
Greetings ,
in LEED V4 there was an approach where I can use a master plan rain water management system .
Greenroofs
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Hi,
We are using the "Small Storm Hydrology Method" to calculate runoff volume and using the Rv based on impervious area. The questions are:
Airport -Terminal- Runways must be included at the calculations?
NC-v4 SSc4:Rainwater managementposted by Konstantina Kalliakoudi on
I have a project that is an Airport Terminal. The Leed boundary includes the runways. Concerning the Credit "Rainwater management": Do the runways participate at the calculations?
Option 2: Parking under cover
NC-v4 SSc5:Heat island reductionposted by Konstantina Kalliakoudi on
Hello to all,
This credit requires the 75% of parking spaces under cover.
1. So this percents refers to parking spaces and not to parking area (m2/ft2), right?
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
shower location in adjacent building
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hello,
Distance to main entrance from long term storage of bikes
NC-v4 LTc6:Bicycle facilitiesposted by akshaya bhaskar on
Hi,
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.