Connectivity within a Big Box Store Shopping Centre

ND-v4 SLLc1:Preferred locations
posted by  Tim Nabholz  on 

What is considered an intersection within a parking lot of a Big Box Store shopping centre.

1
Mon Sep 10, 2018, 3:52 pm

Alternative Bike Network

Schools-NC-v4 LTc6:Bicycle facilities
posted by  Danielle Waters  on 

The school zone is located on a road with a 30 mph speed limit sign.

0

Exterior applied products

NC-v4 EQc2:Low-emitting materials
posted by  Ana García  on 

Hi all! I have a question regarding LEED requirementes for exterior applied products for schools and healthcare projects: Does a roof PVC membrane have to comply with these requirements or those re

2
Fri Sep 7, 2018, 6:43 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Fri Sep 7, 2018, 5:40 pm

Does IT and AV equipment need to be installed prior to IAQ testing?

CI-v4 EQc4:Indoor air quality assessment
posted by  Diana Smiciklas  on 

Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.

1
Tue Feb 16, 2021, 5:46 pm

EKOenergy labeled I-RECs

Retail-CI-v4 EAc6:Green power and carbon offsets
posted by  Raissa Petri  on 

Hello, 

May I use EKOenergy instead of I-RECs for this credit?

Or EKOenergy labeled I-RECs instead of "REC Brazil" labeled I-RECs? 

Thank you!

3
Fri Sep 7, 2018, 4:07 pm

Greenfield with Underground Utilities

NC-v4 LTc2:Sensitive land protection
posted by  Cathal Heneghan  on 

Hi all

My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.

1
Fri Sep 7, 2018, 11:10 pm

Off-Site Waste heat

NC-v4 EAp2:Minimum energy performance
posted by  Marcus Sheffer  on 

There were a couple of previous posts on this subject, one from an industrial process and one from a data center that were located outside the LEED project boundary.

2
Fri Sep 7, 2018, 3:07 pm

Historic District in vicinity

NC-v4 LTc3:High priority site
posted by  Timothy Hillhouse  on 

I am working on a project in a rural NC town which has a historic district in its downtown area.  Our project is downtown however the historic boundary goes around our block essentially surrou

0

District or not district?

NC-v4 EAp2:Minimum energy performance
posted by  Ilaria Piong  on 

I have a building composed of two parts: a warehouse and an office.

1
Fri Sep 7, 2018, 3:59 pm