Dual Flush Flow Rate
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L.
Hoarding dimensions
NC-v4 SSp1:Construction activity pollution preventionposted by Ahmed Labeeb on
Dear All,
Is there any LEED requirement regarding the hoarding dimensions ( distance from ground to the bottom of the panel)?
SSp2 Environmental Site Assessment
Schools-NC-v4 SSp2:Environmental site assessmentposted by Karly Michalowski on
I have a LEEDv4 for Schools project but is focusing on the interior restoration of the building and not site. Is Phase I ESA required for just interior restoration of the building?
Not eligible if no non-potable water?
CI-v4 IPc1:Integrative processposted by emily reese moody on
It appears that a project may not be eligible for the 1 point associated with the Water Related System if their building(s) do not offer non-potable water sources. Is this correct?
Using CBECS 2012 Data for Estimating Energy Consumption
CI-v4 EAp2:Minimum energy performanceposted by Oliver Bate on
I have multiple office projects where there is no consumption data available as the tenants are new to the building- we are going with Option 2 Minimum Energy Performance.
EA-Optimize Energy Performance
NC-v4 EAp2:Minimum energy performanceposted by Irene Carreno Rodriguez on
Hello,
General Emission Evaluation and VOC Content for signage
CI-v4 EQc2:Low-emitting materialsposted by Gabriela Mena on
We are documenting a LEED/WELL project and we want to know if we must include the certification for the signage (branding, emergency exit, etc.) because we do not know in which category it should b
Retro-commission an existing PV array?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Deborah Lucking on
Our project is a county-owned building which will utilize renewable energy from an existing, adjacent, county-owned PV farm.
Multiple CxAs?
NC-v4 EAc1:Enhanced commissioningposted by LUCY WILLIAMS on
Have any project teams had success using two different commissioning agents from two different entities in order to perform commissioning services on their project? For example, can the