Forum quick links
Compliant laboratory and medical equipment
NC-v4 WEc2:Indoor water use reductionposted by LEED Pro Consultant on
For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?
Lack of Sunday bus service
NC-v4 LTc5:Access to quality transitposted by Karen Joslin on
I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we?
Demolition Waste for entire building vs area designated to be LEED Certified.
CI-v4 MRp2:Construction and demolition waste management planningposted by Timothy Hillhouse on
We are renovating a 84,000 sqft warehouse and only LEED Certifying a portion of it 9865 sqft. Should all the construction waste & recycling only be calculated for the small area being cer
EPD as an alternative approach to comply with Option-4 requirements
NC-v4 MRc1:Building life-cycle impact reductionposted by Osman on
Hi all,
Is it acceptable to quantify for the impact measures in the proposed building using EPD?
Thank you so much for your support,
Osman
Min. Number of Fixtures
NC-v4 WEc2:Indoor water use reductionposted by Cora Kenrick on
Hello Fellow Users,
Is there a minimum number of fixtures that a project is required to get the 6 points for this credit.
Credit Review
CS-v4 INc2:LEED Accredited Professionalposted by Luis Fretes on
Can we submit construction credits for review during design?
Furniture refurbishment - 30%
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kriss Kokoefer on
How do I find out if any certified companies have received a point for refurbished furniture? The point is awarded if 30% of the furniture or furnishings are refurbished, reused or salvaged.&
Enhanced strategies: CO2 monitoring for spaces served with ERU & 100% OA
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Sue Bryant on
For this option, all densely occupied spaces have to have CO2 monitoring that is tied into the central BAS. Is there an exception for spaces that are served with 100% outside air?
Removal of parking = EP??
NC-v4 LTc7:Reduced parking footprintposted by Cora Kenrick on
Hi Fellow Users,
I'm looking for some help.
Floor area Ratio (FAR) calculation for Zero Lot Line Projects
NC-v4 SSc4:Rainwater managementposted by Andrea Costa on
Dear all,
Please, could someone explain me in further detail how to proceed with the FAR calculation?