Forum quick links
VOC Budgets and Select One Option Guidance
NC-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
We have a v4 project that would like to use a small amount of a coating product that does not meet VOC content requirements.
Factory-finished docklevellers
NC-v4 EQc2:Low-emitting materialsposted by Agnieszka Rylska on
Hello,
Biodegradable, Recyclabe Plastic Pail LEED Credit Contribution?
NC-v4 MRp2:Construction and demolition waste management planningposted by George Gornick on
We manufacture sealant that we package in a 5 gallon plastic pail made from Type 2 HPDE and additives that make it Biodegradable. The pail will degrade in 120 days in the landfill.
2 or 4 points?
NC-v4 LTc5:Access to quality transitposted by Raphael Sperry on
Anyone know why you can get 3 points for 144/108 weeday/weekend trips, and 5 for 360/216, but not 4 for 252/162, or 2 points if between teh thresholds for 1 and 3?
Batteries, mercury lamps, and electronic waste
NC-v4 MRp1:Storage and collection of recyclablesposted by Gregory Martin on
I was curious how much space for these new items needs to be set aside?
LEED ND - Transportation Demand Management : Vehicle-share spaces with high/low frequency transit
ND-Plan-v4 NPDc8:Transportation demand managementposted by Nuttanee Vongveeranonchai on
Dear all,
LEED V4 NC Healthcare project EAc2 points table guidance?
NC-v4 EAc2:Optimize energy performanceposted by Aditya Potipireddi on
Hello All,
Insulated Metal Panel
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Any thoughts how an insulated metal panel would (or would not be included) in the credit for the Option 1 path? I assume is would not need to be included as it is a factory-finished metal pro
Previous Owner to Demolish Building Prior to Our New Owner Taking Control
NC-v4 MRp2:Construction and demolition waste management planningposted by Steven Blais on
Our client is negotiating to lease or acquire property to construct new facilities.
Sound Isolation for Regularly Occupied space next to an Electrical room
NC-v4 EQc9:Acoustic performanceposted by Jill Kurtz on
If I have an conference room (occupied area) next to an electrical room, do I...