Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Interior Lighting Controls - Daylighting Controls

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of

1
Wed Mar 7, 2018, 11:08 pm

Demolition includes Mechanical and Electrical equipment

NC-v4 MRc5:Construction and demolition waste management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.

1
Tue Mar 6, 2018, 3:16 pm

ventilation chimneys for buffer space

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.

3
Mon Mar 5, 2018, 8:38 pm

Permanent entrywway systems - rollout mats?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Keith Robertson  on 

The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent.

3
Mon Mar 5, 2018, 6:15 pm

School as a Teaching Tool French Learning Lab??

Schools-NC-v4 INc1:Innovation
posted by  Leanne Conrad  on 

I am working with a Francophone school in Canada who wish to pursue the School as a Teaching Tool innovation credit.

3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Mar 5, 2018, 3:54 pm

ASHRAE 90.1-2010 - Unmet hours

CS-v4 EAp2:Minimum energy performance
posted by  Giuseppina Amorusi  on 

Hi all,

I’m modeling for a project under LEED CS v4 according to ASHRAE 90.1-2010.

I know that unmet hours shall not exceed 300 .

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Mon Mar 5, 2018, 3:53 pm
2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Mar 5, 2018, 12:28 pm

Option 1 Accessible Floor or Ceiling

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Jonathan Weiss  on 

Anyone with experience on how this option works?  For a project where we have acoustical ceiling systems over more than 50% of the ceilings, does this apply?  How do we define "not entang

0

Using ASHRAE 90.1-2013 as reference standard for v4 projects

Schools-NC-v4 EAc2:Optimize energy performance
posted by  Gail Vittori  on 

For v4 projects, is there any adjustment in point allocation for projects using 90.1-2013 ILO 90.1-2010?

1
Mon Mar 5, 2018, 3:42 pm