Forum quick links
Inclusion of total building in density calculation
CI-v4 LTc2:Surrounding density and diverse usesposted by Deborah Stadler on
What happens when the 1/4 mile from the project boundary bisects a dense building? Can the whole building be included in the calculation? Only the part of the building that is in the 1/
Full spread vs non-full spread adhesives and sealants.
NC-v4 EQc2:Low-emitting materialsposted by Dalton Ho on
Just noticed this line while reading the reference guide for the 10,000th time and it may have been overlooked by me previously, looking for any other thoughts/experiences/suggestions.
Building Add-on to Design-Build Parking Structure
NC-v4 MPR2:Must use reasonable LEED boundariesposted by GBD Architects on
We are pursuing an office project that would be essentially an addition to a parking structure that is being built design-build just several months in advance of when our work would take place.
Ventilation in the garage with OPTION 2
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
We are going to demonstrate the compliance with the prerequisite using OPTION 2. CEN STANDARDS EN 15251–2007 AND EN 13779–2007.
1/4 mile radius cuts through building...
NC-v4 LTc4:Surrounding density and diverse usesposted by Alara Brinton on
The edge of my 1/4 mile radius cuts half way through a couple buildings...would I include half the area in my density calculations, whole, or not include the building at all?
ACCESS TO QUALITY TRANSIT
NC-v4 LTc5:Access to quality transitposted by jade dayday on
hi,
is it possible to earn a credit if our project offers a free ride to all occupants from the entrance to the nearest rideshare stop?
thank you.
Can the Projects Fundamental CxA be an employee of the Mechanical Design firm, but not part of MEP Design Team?
NC-v4 EAp1:Fundamental commissioning and verificationposted by marc myers on
- The CxA may be a qualified employee of the owner, an independent consultant, or an employee of the design or construction firm who is not part of the project’s design or construction team, o
brownfield confusion
NC-v4 LTc3:High priority siteposted by Larry Sims on
Okay, I'll start this off by stating the requirement, and then asking a (simple) question. LEED v4 requirement: Locate on a brownfield where "soil or groundwater contamination has been identified"
How to Perform fundamental commisiioning and verification of VRF System?
NC-v4 EAp1:Fundamental commissioning and verificationposted by JASON NIEN on
we have a VRF(Variable Refrigerant Flow) system for air conditioning . if we want to execute commissioning , how can i do this credit ? how to verify VRF system performance? thanks .
Irrigation controller - WaterSense
NC-v4 WEp1:Outdoor water use reductionposted by Ricardo Sá on
Dear All,
Our project is located in Portugal and the project team is intendend to install a WaterSense irrigation controller.