Forum quick links
Error in international tips?
CS-v4 MRc1:Building life-cycle impact reductionposted by Jens Apel on
Could it be that there is an error in the international tips section?
CASRN Publishing
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Corey Carter on
Can someone explain exactly what is required under the first option in Option 1? Is this a self certification utilizing GreenScreen or must this be third party?
LAB21
EBOM-v4 EAp2:Minimum energy performanceposted by Ivan Blazevic on
Can a project (with adeqaute proportion of lab area) located in the United Kingdom benchmark its performance against Lab21 tool data?
Strategy A - 2500 cd/m2
NC-v4 EQc6:Interior lightingposted by Filipe Boni on
I`m trying to understand the Option 2 -Strategy A and having difficulty of finding this illuminance on brazilian cutsheets. Is this information that I need to look at?
Glass Roof Above Stairwell
NC-v4 SSc5:Heat island reductionposted by Lucas Ozols-Mongeau on
We are currently designing a new construction project that will have a glass roof above a stairwell shaft.
opaque building envelope construction
NC-v4 EAp2:Minimum energy performanceposted by Ahmed El-Semary on
i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??
Flooring & "categories"
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Flooring & "categories"
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
underground infiltration structure LID?
CS-v4 SSc4:Rainwater managementposted by Jens Apel on
I am not quite sure if the approach discussed in my project team is a viable way to achieve this credit and would like to check back with you.
Visitor parking only
CI-v4 LTc5:Reduced parking footprintposted by Karen Elliott on
We have an large office space in Central London that has 2 car parking spaces, but the staff will not be able to use them. They will only be used in exceptional circumstances for visitors.