Phased Flush Out

Schools-NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.

1
Mon Aug 28, 2017, 2:09 pm

Supplemental Guidance to the MPR for LEED v4

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  SoYoung Lee  on 

It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.

1
Wed Mar 16, 2016, 3:22 pm

municipality irrigation line

CS-v4 WEc1:Outdoor water use reduction
posted by  Radwa Amin  on 

the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you

1
Tue Oct 15, 2019, 7:26 am

Option 1 - ASE and the 10% LEED requirement

CI-v4 EQc7:Daylight
posted by  Alain Brierley  on 

I am working on a large three story office building and analyzing it to see how it would preform under Option 1 requirements.

1
Tue Jan 17, 2017, 7:23 pm

Utility tariff - an accepted DR strategy?

Data-Centers-NC-v4 EAc4:Demand response
posted by  H.K.C.B. Heendeniya  on 

Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.

1
Fri Dec 13, 2013, 2:17 pm

Exemplary Performance for Heat Island Reduction

Homes-v4 SSc1:Heat island reduction
posted by  Nelca Roco  on 

Why in the checklist, it is said that Heat Island reduction for LEED for Homes is applicable for exemplary performance. Why here in the Guide it says it is not applicable?

1
Fri May 5, 2017, 5:24 pm

Campus Cooling Tower

NC-v4 WEc3:Cooling tower water use
posted by  Brightworks Sustainability  on 

My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.

0

New and Renovation: How to Determine Points from Table 1

NC-v4 EAc2:Optimize energy performance
posted by  James Keohane  on 

I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.

1
Fri May 26, 2017, 1:46 pm

Glare control device simulation - Option 2

NC-v4 EQc7:Daylight
posted by  Hanh Truong  on 

Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).

1
Thu Jul 13, 2017, 2:17 pm

ESC plan

NC-v4 SSp1:Construction activity pollution prevention
posted by  Ana Paula Quiros  on 

Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.

1
Tue Jan 17, 2017, 4:37 pm