Phased Flush Out
Schools-NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
We have a phased reno/add school project that would prefer to earn IEQ 4 by way of post occupancy flush out.
Supplemental Guidance to the MPR for LEED v4
NC-v4 MPR1:Must be in a permanent location on existing landposted by SoYoung Lee on
It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.
municipality irrigation line
CS-v4 WEc1:Outdoor water use reductionposted by Radwa Amin on
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Does that count as an alternative water sources? Thank you
Option 1 - ASE and the 10% LEED requirement
CI-v4 EQc7:Daylightposted by Alain Brierley on
I am working on a large three story office building and analyzing it to see how it would preform under Option 1 requirements.
Utility tariff - an accepted DR strategy?
Data-Centers-NC-v4 EAc4:Demand responseposted by H.K.C.B. Heendeniya on
Hi, Our electricity tariff for industries has a time based component and peak demand (kVA) component.
Exemplary Performance for Heat Island Reduction
Homes-v4 SSc1:Heat island reductionposted by Nelca Roco on
Why in the checklist, it is said that Heat Island reduction for LEED for Homes is applicable for exemplary performance. Why here in the Guide it says it is not applicable?
Campus Cooling Tower
NC-v4 WEc3:Cooling tower water useposted by Brightworks Sustainability on
My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
ESC plan
NC-v4 SSp1:Construction activity pollution preventionposted by Ana Paula Quiros on
Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.