Forum quick links
Stormwater Collected off-site & Reused inside the building
NC-v4 SSc4:Rainwater managementposted by Charline SEYTIER on
Hello everyone, Our project is planning to collect all the stormwater in an underground tank for reuse inside the building & for irrigation on-site.
Core and shell within an NC
NC-v4 EQc8:Quality viewsposted by Susan Di Giulio on
We are workingon a 3 story makers lab and classroom building at a university. The third floor is being built as core and shell for a future decision on use.
ISO21930:2017
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
ISO 21930:2017 has now been published. Am I correct that EPDs which have already been published in accordance with ISO 14025 and ISO 21930:2007 don't need to make any amendments? How about EPDs w
1 point or 2?
NC-v4 EQc6:Interior lightingposted by Michelle Oishi on
The description of the credit seems to provide two options each worth 1 point but links them with an "OR".
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Campus project with central plant
NC-v4 EAc4:Demand responseposted by Brightworks Sustainability on
Our project is a student dorm on a university campus.
Towers as part of a single building
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
A building is composed by three towers that have the basement, the ground floor, and the first floor in common. The system for the baseline model shall be System 8.
How to specify for v4 LEED compliance
Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.
SSc6 - Site Improvement Plan
EBOM-v4 SSc6:Site improvement planposted by Levi Jimenez on
Our clients facility is exploring avenues to improve the site to comply with this credit, but is in a dense urban area (Oakland, Ca) and the landscaping on the site itself can not undertake any fur
worksheet language
Healthcare-v4 IPc1:Integrative processposted by Duncan Griffin on
The worksheet is somewhat vague about the language that would satisfy LEED reviewers - for example, Site Conditions Baseline assumptions or Massing/Orientation Baseline assumptions could be broad o