Forum quick links
reference book LEED v4 ND is it mistake?
ND-v4 NPDp1:Walkable streetsposted by natalia rakhmanova on
Please any AP ND explain me how they got BH-SC ratios 1:0,6 1:0,86 and 1:1,33 instead of 1:1,66 1:1,16 and 1:0,75 ?
Adoption of Investigated Strategies
NC-v4 IPc1:Integrative processposted by Philippa Cameron on
Do you need to adopt all strategies that you demonstrate as facilitating best energy performance for this credit?
On-site restoration
NC-v4 SSc2:Site development - protect or restore habitatposted by Anaïs P on
Have the 30% of areas with native and adaptated vegetation to be in the same place of the previously developped areas?
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Sustainable Agriculture and
EBOM-v4 MRc1:Purchasing - ongoingposted by Meier Corporate Account on
Is there a way, outside creating another pilot program, to update the spreadhseet for the Purchasing - Ongoing credit? 1. Food Alliance is no longer a viable entity.
WEp1 and c1: Indoor Water Use Reduction
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
Hi! We understand that all newly installed water fixtures must be WaterSense labeled.
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Waste Stream Study: Address top 4 only, or any 4 out of the 5?
Retail-NC-v4 MRp1:Storage and collection of recyclablesposted by Greg Romanczyk on
The credit requirement indicates a waste stream study needs to be conducted to identify the project's top five recyclable waste streams.
When covering a wide range of products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
A company is planning to publish an EPD(s) for their gypsum board products.
Core and Shell project with public bike scheme adjacent
CS-v4 LTc5:Access to quality transitposted by Sean Hogan on
Our project seeking C&S certification for and existing building redevelopment.