NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Reduced truck idling
NC-v4 LTc8:Green vehiclesposted by Julia Otero on
In a warehouse to pursue option 2, which characteristics must have external connectors in terms of power and position acording to the loading docks? Thanks!
Functional entryway of project
CS-v4 LTc5:Access to quality transitposted by Martin Stowell on
For this credit, 'functional entry of the project' means from the project boundary or the actual building?
Retail project
EBOM-v4 LTc1:Alternative transportationposted by Charalampos Giannikopoulos on
Should customers of a large retail building selling large items (and hence requiring customers to arrive by car and carry items purchased) be included in the calculations? Thanks!
Building Envelope Seasonal Testing & General Comment
CS-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Hi! In general, the guidelines for this credit are...very general and vague.
Peak electricity demand
CS-v4 EAc4:Demand responseposted by Tobias Berge on
A LEED v 4 Core & Shell Project in Sweden (office and hotell) will try to apply for this credit.
Daily transit count for street cars
NC-v4 LTc5:Access to quality transitposted by soha yamani on
How can i calculate transit average trips for street car?
Monitoring and Inspection of Irrigation System
EBOM-v4 SSc5:Site managementposted by RYAN BEN SABILALA on
For SS Credit Site Management, the performance requirement says: "Monitor irrigation systems manually or with automated systems AT LEAST EVERY TWO WEEKS during the operating season and correct any
Monitoring requirement for Residential Projects
NC-v4 EQp1:Minimum indoor air quality performanceposted by Arpan Bakshi on
Question about meeting this prereq in Residential Projects - v4 requires one of three types of monitoring for naturally ventilated projects - exhaust airflow, alarm on openings, or CO2 with alarm.
On site + Off-site restoration
ND-Plan-v4 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.