NC-v4 SSc3:Open spaceposted by Katherine Ann Resurreccion on
Hi, The project will have water features and water lilies on it. Can somebody confirm that we can measure the whole water feature area to contribute as vegetated space?
Site Management-Organic Waste Management
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Manufacturing projects need to consider organic waste management?
Air Barrier Testing- Commercial
EBOM-v4 EAp2:Minimum energy performanceposted by Justin Tyrrell on
Hi, I work for a company that currently does thermal bypass inspections and air barrier testing on single family and multifamily new construction projects.
Precertification of EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Charalampos Giannikopoulos on
The International EPD System includes the possibility for pre-certification of EPDs as a step in the process to develop Product Category Rules (PCRs).
Diverse "publicly available" use
NC-v4 LTc4:Surrounding density and diverse usesposted by Gina Rossi on
Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
Education & Outreach ID credit for v4?
Hospitality-NC-v4 INc1:Innovationposted by Karen Heet on
Howdy! Does v4 accept the ID credit Education & Outreach as the 2009 version did? Many thanks!
Policies - credit's pursued
EBOM-v4 SSp1:Site management policyposted by Allison Smith on
I'm looking for some guidance regarding drafting policies. I've downloaded the USGBC templates, however do we need to include sections related to credits that we are not pursuing?
Toilets for customer use
Retail-CI-v4 WEc1:Indoor water use reductionposted by Karen Elliott on
We have a small retail unit with no toilet access for customers.
Six assemblies or five for Option 2?
NC-v4 EQc2:Low-emitting materialsposted by Nadav Malin on
Under Option 2, the credit language says "The budget method organizes the building interior into six assemblies:" but then proceeds to list only five. Anyone know what the sixth is?