Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Recycled Water

CI-v4 WEc1:Indoor water use reduction
posted by  ESD Engineer  on 

The building our project is located in uses municipally supplied recycled water to serve the supply to the water closets and urinals. Can this be used to calculate additional savings?

1
Tue Aug 15, 2017, 9:09 pm

Allowed minor improvents

NC-v4 LTc2:Sensitive land protection
posted by  soha yamani  on 

what the word clearings mean in the allowed minor improvement section for water bodies and wetlands ?

1
Mon Jan 2, 2017, 1:47 pm

100% well or non-potable water

EBOM-v4 WEc3:Cooling tower water use
posted by  Elizabeth Dunn  on 

Our building uses 100% well or non-potable water.

0

LEED NCv4 getting harder

NC-v4 SSc4:Rainwater management
posted by  Marco Valerio Ceccotti  on 

Hi All. This is just a suggestion. To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "natural land cove

1
Mon Mar 21, 2016, 5:32 pm

Proposed Case-Process Load

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.

1
Wed May 24, 2017, 4:24 pm
1
Thu Jul 20, 2017, 9:49 pm

USGBC-approved wood certification schemes

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jane Wigren  on 

Where can I find a list over USGBC-approved wood certification schemes? I am especially interested in those found outside of the United States.

1
Tue Jan 14, 2014, 2:08 pm

V4 Advanced Energy Metering Template is Protected

NC-v4 EAc3:Advanced energy metering
posted by  Steven Wychorski  on 

Hello The USGBC approved Data template for Building Energy Metering is locked/protected. It only has 2 meter tabs. My project has 60+ different meters to input.

1
Fri Oct 21, 2016, 10:45 pm

Existing Chillers in Basement (not in project boundary)

CI-v4 EAp3:Fundamental refrigerant management
posted by  Heather Zeto  on 

Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).

1
Mon Aug 28, 2017, 10:14 pm

Continuous Monitoring Sensors

EBOM-v4 EQc3:Thermal comfort
posted by  Laura Danzig  on 

Hi there, a quick question regarding the locations of the sensors/measurements required for this credit.

1
Wed Mar 8, 2017, 8:59 pm