Forum quick links
Underground infiltration tank
NC-v4 SSc4:Rainwater managementposted by Frantisek Macholda on
Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).
Monitoring and Inspection of Irrigation System
EBOM-v4 SSc5:Site managementposted by RYAN BEN SABILALA on
For SS Credit Site Management, the performance requirement says: "Monitor irrigation systems manually or with automated systems AT LEAST EVERY TWO WEEKS during the operating season and correct any
Monitoring requirement for Residential Projects
NC-v4 EQp1:Minimum indoor air quality performanceposted by Arpan Bakshi on
Question about meeting this prereq in Residential Projects - v4 requires one of three types of monitoring for naturally ventilated projects - exhaust airflow, alarm on openings, or CO2 with alarm.
On site + Off-site restoration
ND-Plan-v4 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Guillaume Martel on
Our project is redevelopping a contaminated site (whole city block), which is part of a larger urban area belonging to the same owner.
CO2 sensors - "thermal zone"
CS-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
For naturally ventilated spaces in one of my projects it seems that CO2 monitors are the only option applicable. I've got some questions regarding this: 1.
Tri-gen
NC-v4 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am QA'ing a model for a building that will be fed via a cogeneration plant (with absorption chillers) and therefore is a little complicated.
Updates Differences Between 90.1-2007 and 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by John Krutko on
Does anyone have a link to a concise list of the differences between 90.1-2007 and 90.1-2010?
CO Sensors in Multi-Family Highrise
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jennifer Rennick on
For a Multi-Fam Highrise, the corridors will be heated with a ducted roof-top gas furnace split dx system will be installed.
No green cleaning products available?
EBOM-v4 EQp3:Green cleaning policyposted by Andres Schwarz on
My question is if it is required to actually buy certified cleaning products for the prerequisite in order to demonstrate compliance.
Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Antje Holdefleiss on
Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?