Forum quick links
Which rating system to use
CI-v4 INc2:LEED Accredited Professionalposted by Pamela Smith on
Major renovation of a 3 story office building in a historic district. Basically zero lot line, cannot change the exterior, pooled parking with neighboring buildings. Select for BDC or IDC?
Option 2. Additional reductions beyond 30%. VS. Reduce LWR 50%
NC-v4 WEc1:Outdoor water use reductionposted by Jing Zhang on
Outdoor Water Use Reduction Credit Does option 2 means, if reduction ranges from 50% to 100%, then, at least 30% need to be achieved only through plant and irrigation system efficiency.
Budget Method
NC-v4 EQc2:Low-emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Thermal Comfort
CS-v4 IPc1:Integrative processposted by Ciaran McCabe on
Has anyone any experience in terms of what a LEED reviewer might look for in terms of Thermal Comfort Ranges for this credit ?
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Ongoing Goods Accounting
EBOM-v4 MRc1:Purchasing - ongoingposted by Jordan Sager on
In the reference guide, the credit language says "Purchase at least 60%, by cost, of total ongoing consumables that meet at least one of the following criteria...: Postconsumer recycled content: mu
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
ERV
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?
Matting
EBOM-v4 EQp3:Green cleaning policyposted by Louise Taillon on
are there are any specifics as to what type or quality of matting that must be installed?
PV System on Campus Project
CS-v4 EAc5:Renewable energy productionposted by Annalise Reichert on
I am working on a Campus project that consists of 3 Core and Shell office buildings and 1 parking garage.