EBOM-v4 EAp2:Minimum energy performanceposted by Meier Corporate Account on
Good Afternoon, We cannot complete the existing credit as we cannot meet any of the Cases / Options. There is no Energy Star rating for dairies...
Pilot credit: No Cooling Tower [ v4 - bc+d)
NC-v4 INc1:Innovationposted by Ydo Schuuring on
Hello, For a project no coolingtowers are used. There for we have the possibility to achieve the Pilot credit No Cooling Tower.
Alarm to closed openings
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dears, When we have a Naturally Ventilated Space, we can use an alarm to indicate that the openings are close. Someone know if I can use an light alarm? or I must use an sound alarm?
Pre-Consumer Recycled Content
EBOM-v4 MRc1:Purchasing - ongoingposted by Claire Bannister on
How is pre-consumer recycled content calculated in v4? In v2009, there were columns for both pre- and post- consumer.
Stormwater Collected off-site & Reused inside the building
NC-v4 SSc4:Rainwater managementposted by Charline SEYTIER on
Hello everyone, Our project is planning to collect all the stormwater in an underground tank for reuse inside the building & for irrigation on-site.
Core and shell within an NC
NC-v4 EQc8:Quality viewsposted by Susan Di Giulio on
We are workingon a 3 story makers lab and classroom building at a university. The third floor is being built as core and shell for a future decision on use.
ISO21930:2017
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Akira Kataoka on
ISO 21930:2017 has now been published. Am I correct that EPDs which have already been published in accordance with ISO 14025 and ISO 21930:2007 don't need to make any amendments? How about EPDs w
1 point or 2?
NC-v4 EQc6:Interior lightingposted by Michelle Oishi on
The description of the credit seems to provide two options each worth 1 point but links them with an "OR".
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Campus project with central plant
NC-v4 EAc4:Demand responseposted by Brightworks Sustainability on
Our project is a student dorm on a university campus.