NC-v4 EQc9:Acoustic performanceposted by Levan Natadze on
Hello, Cold you please provide a tip, how to achieve reverberation time 0.8 in very large open office areas. Good absorptive materials do mot work for so large spaces as 1,000 sq.
Data Center Energy Calculator Tool
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Jack Jenkins on
Does anybody have any experience with this new tool or know whether any further guidance on how it should be used is available? I have two questions in particular: 1) How is the baseline electrica
Manufacturing process
NC-v4 EAp2:Minimum energy performanceposted by ignacio furniés on
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.
Not Regularly occupied
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Phillip Cook on
In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.
Products with Zero-VOCs disclosed by MFG
CI-v4 EQc2:Low-emitting materialsposted by Stacey Olson on
If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?
Pressure flow rates
EBOM-v4 WEp1:Indoor water use reductionposted by OSCAR DE LA RED on
When introducing the design flow rate values in the indoor water calculator for option 1 calculated water use, we should use the flow rate fixtures values associated to the actual facility pressur
TVOC range for flooring?
NC-v4 EQc2:Low-emitting materialsposted by Tommy Linstroth on
I'm trying to figure out where you get the TVOC range for anything for flooring, namely Floorscore or CRI Green Label Plus?
right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran
Interior Lighting Quality
NC-v4 EQc6:Interior lightingposted by April Wang on
Regarding EQc6 option 2. I'm working towards satisfying strategies G and H. As part of the requirement, each space is to also meet the corresponding strategies E and F.
Lighting Levels
CI-v4 EQc6:Interior lightingposted by Kristopher Croghan on
For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?