Reverberation Time in Very Lage Open Office Areas

NC-v4 EQc9:Acoustic performance
posted by  Levan Natadze  on 

Hello, Cold you please provide a tip, how to achieve reverberation time 0.8 in very large open office areas. Good absorptive materials do mot work for so large spaces as 1,000 sq.

0

Data Center Energy Calculator Tool

Data-Centers-NC-v4 EAc2:Optimize energy performance
posted by  Jack Jenkins  on 

Does anybody have any experience with this new tool or know whether any further guidance on how it should be used is available? I have two questions in particular: 1) How is the baseline electrica

1
Sun Apr 10, 2016, 4:47 pm

Manufacturing process

NC-v4 EAp2:Minimum energy performance
posted by  ignacio furniés  on 

My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.

1
Tue Aug 9, 2016, 1:56 pm

Not Regularly occupied

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Phillip Cook  on 

In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.

1
Wed Aug 6, 2014, 4:10 pm

Products with Zero-VOCs disclosed by MFG

CI-v4 EQc2:Low-emitting materials
posted by  Stacey Olson  on 

If the manufacturer provides documentation indicating the product has zero VOCs, does additional documentation showing compliance w/ CDPH Standard Method V1.1-2010 still need to be provided?

1
Tue Sep 5, 2017, 12:06 pm

Pressure flow rates

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

When introducing the design flow rate values in the indoor water calculator for option 1 calculated water use, we should use the flow rate fixtures values associated to the actual facility pressur

1
Tue Jun 27, 2017, 1:10 am

TVOC range for flooring?

NC-v4 EQc2:Low-emitting materials
posted by  Tommy Linstroth  on 

I'm trying to figure out where you get the TVOC range for anything for flooring, namely Floorscore or CRI Green Label Plus?

1
Wed Feb 1, 2017, 8:39 am

right of ways adjacent to project?

ND-Plan-v4 NPDc7:Transit facilities
posted by  Ian Scott  on 

Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran

1
Mon Nov 30, 2015, 11:13 pm

Interior Lighting Quality

NC-v4 EQc6:Interior lighting
posted by  April Wang  on 

Regarding EQc6 option 2. I'm working towards satisfying strategies G and H. As part of the requirement, each space is to also meet the corresponding strategies E and F.

1
Thu Jul 28, 2016, 8:16 pm

Lighting Levels

CI-v4 EQc6:Interior lighting
posted by  Kristopher Croghan  on 

For the three levels of lighting, what about an overhead light, and a task light. Technically that is three different levels when both the task and overhead lights are on. Thoughts?

1
Tue Sep 5, 2017, 10:11 pm