Help with LEED ND

ND-v4 MPR1:Must be in a permanent location on existing land
posted by  T J  on 

Im a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including check

1
Wed Feb 22, 2017, 10:15 pm

No irrigation for pre-req

NC-v4 WEp1:Outdoor water use reduction
posted by  Robyn Dowsey  on 

I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true

1
Thu Aug 27, 2015, 8:37 pm

Off-site charging station

NC-v4 LTc8:Green vehicles
posted by  Kristina Pobre  on 

Client is developing a ha land. We are applying certification for only a small part of it (about 2%). The LEED-project has its own parking and a % of it is for green vehicles.

0

Option 3 tracking

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Tommy Linstroth  on 

It doesn't appear USGBC has updated their tracking tool/materials calculator to account for Option 3 yet, or have you seen an updated resource?

1
Thu Jun 9, 2016, 6:34 pm

LEED Certification for a portion of a building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Eesmyal Santos-Brault  on 

Hi there, I am working on a 17 storey residential project with social housing on the podium levels (3 storey). The social housing part has a separate entrance, mechanical and electrical systems.

1
Thu Jun 22, 2017, 10:02 am

Water Meter

Homes-v4 WEp1:Water metering
posted by  Gregory Minott  on 

My understanding of this credit, is that at a minimum there needs to be a water meter installed to monitor the entire building. It is not required to provide submetering.

1
Tue Sep 13, 2016, 1:03 am

Modeling system serving both HVAC and Process

NC-v4 EAc2:Optimize energy performance
posted by  Visu Boj  on 

We are doing certification for a beverage factory. The factory requires chilled water for process load that is served by 2*1080 kW Evaporatively cooled Screw chillers.

1
Sun Dec 4, 2016, 8:36 pm

ESC plan for major renovation of data center

NC-v4 SSp1:Construction activity pollution prevention
posted by  sean wang  on 

We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.

1
Tue Feb 9, 2016, 5:33 pm

Interior Cross-Contamination Prevention, Industrial Curtain Wall

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ashley Wisse  on 

Our project contains a theater scene shop including a small area where spray paint will occasionally be used.

1
Tue Jan 17, 2017, 7:59 pm

CC&R

ND-Plan-v4 GIBc17:Light pollution reduction
posted by  William Gagnon  on 

Hello, Any examples of CC&Rs relative to light pollution reduction?

0