Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Inconsistency between BD+C and O+M

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adam Stoker  on 

Despite efforts to better align the rating systems in LEED v4, there are some inconsistencies between the Enhanced Indoor Air Quality Strategies credits in BD+C and O+M.

0

Bicycle Shower Facilities

NC-v4 LTc6:Bicycle facilities
posted by  S. Sachs  on 

Follow up question to Miles's question about the shower facilities in an adjacent building: I have a similar building that is being built part of a school campus, in which the building adjacent t

1
Tue Jun 7, 2016, 5:22 pm

Lighting steps vs on/off

CI-v4 EAp2:Minimum energy performance
posted by  Jorge Lopez de Obeso  on 

Hello everyone, I am currently working on a LEED for CI v4 project.

1
Wed Mar 15, 2017, 2:04 pm

Bus Stops

NC-v4 LTc5:Access to quality transit
posted by  Florencia Guggenheim  on 

Hi, i would like to know in the case i have one bus stop but with different bus lines, can i count de trips from every line or just of one of them? thank you very much!

1
Mon Jul 28, 2014, 9:30 pm

EPR Example

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jenelle Shapiro  on 

Does anyone have an example of compliant EPR documentation?

0

Through Connections

ND-v4 NPDc6:Connected and Open Community
posted by  Martine Desbois  on 

Could you please clarify if through connection can be pedestrian only. Thank you

1
Mon May 11, 2015, 4:43 pm

Exhaust monitoring

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Ricardo Sá  on 

Do monitoring requirements also apply to spaces which only have exhaust requirements as per ASHRAE 62.1 - 2010 (e.g. toilets)? Thanks in advance!

1
Tue May 23, 2017, 7:06 pm

Example of a populated BPDO calculator with all tabs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jaspreet Pahwa  on 

Project Location: United States Trying to determine for EPD tab within BPDO calculator, if the bottom-line of Weighted EPD value needs to be 20 or as long as 20 products from 5 manufacturer's are

0

Workstation Components and C2C Certification

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Ashley Hu  on 

Hi there! Some Cradle to Cradle (C2C) certifications notes exclusions.

1
Mon Mar 27, 2017, 12:54 pm

EQ p3 - Garage Pollutant Protection

Mid-Rise-v4 EQp3:Garage pollutant protection
posted by  Brendan Isard  on 

If a multi-family midrise project has a garage outside the building envelope with independent duct work and ventilation from the common areas and residences in the building, would this project be a

1
Tue Jan 17, 2017, 9:00 pm