Disincentivizing Low Emitting Products
CI-v4 EQc2:Low-emitting materialsposted by Michelle Rosenberger on
The new bundling of low emitting categories into one credit is resulting in disincentivizing our v4 projects from pursuing low emitting credits they always used to before.
Facilities off-site alllowed but cannot be double counted
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Nate Tsang on
Hello, I am currently working on a project and we are targeting LEED ND. As part of LEED ND, one of the buildings will be LEED NC certified.
Manual Override
NC-v4 SSc6:Light pollution reductionposted by Donald Green on
Is there any circumstance whereby an after hours manual override for a Civic Building would not be acceptable for exterior lighting?
LEED CI MPR for existing land...
CI-v4 MPR1:Must be in a permanent location on existing landposted by Keith Robertson on
V4 cites the MPR requirement to build on already existing land as a requirement for CI projects. Isn't that a given?
Prescriptive compliance
CI-v4 EAc2:Optimize energy performanceposted by Michael Wahjudi on
Can a project eligible for points under Base Building Systems - Building Envelope, Opaque and Building Envelope, Glazing if they can meet most of recommendations from 50% AEDG?
Envelope CxA Requirements
NC-v4 EAp1:Fundamental commissioning and verificationposted by Risto Beatty on
Do the rules for who can be a CxA also apply to envelope commissioning? That is, can the envelope consultant on a project also perform the envelope commissioning?
Single tenant O&M certification on a multitenant building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
LEED O&M 2009 reference guide stated (page xxii) that "certification applies only to whole buildings" and that "the project of a multitenant building must involve at least 90% of the total gros
Pharmaceutical Manufacturing factory project
Healthcare-v4 MPR1:Must be in a permanent location on existing landposted by Magda Aghababyan on
Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.
Roof Assembly
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
If we are making repairs to the exterior of the roof, can we then account for the entire roof as a roof assembly where Exterior sheathing/surface is one layer, structural elements is 2nd layer and
Renewable Energy Production - point calculation
NC-v4 EAc5:Renewable energy productionposted by juyew tang on
hi, i am new with this LEED. now i design for a new project. under this NC-V4, EAC5, is the point award still based on the below table? percentage of on-site renewable energy LEED point 1%