Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Block length

ND-v4 NPDp1:Walkable streets
posted by  Martine Desbois  on 

Hi Elliot, Could you confirm that plaza and pedestrian only paths, being right-of-ways, can be used to define the end of a block length? Thanks

0

Site Accessment with Major Renovation

NC-v4 SSc1: Site assessment
posted by  Parker williams  on 

If we are proposing new construction, major renovation, how would this credit work? --If there is minimal exterior site on a large building.

1
Tue Nov 3, 2015, 9:17 pm

Providing water quality treatment to meet credit requirements

CS-v4 SSc4:Rainwater management
posted by  Martin Stowell  on 

Our project provides water quality treatment of a majority of the stormwater prior to discharging from the stormwater best management practices at the site.

1
Wed Apr 13, 2016, 5:54 pm

Alternative Compliance Path

NC-v4 EAc2:Optimize energy performance
posted by  Gabriela Mena   on 

Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th

1
Thu Jun 1, 2017, 6:19 pm

Resinous Flooring

CI-v4 EQc2:Low-emitting materials
posted by  Marcia Weekes  on 

Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?

1
Sun Aug 27, 2017, 12:33 pm

LEED CI MPR for existing land...

CI-v4 MPR1:Must be in a permanent location on existing land
posted by  Keith Robertson  on 

V4 cites the MPR requirement to build on already existing land as a requirement for CI projects. Isn't that a given?

1
Sat Aug 26, 2017, 6:14 pm

Prescriptive compliance

CI-v4 EAc2:Optimize energy performance
posted by  Michael Wahjudi  on 

Can a project eligible for points under Base Building Systems - Building Envelope, Opaque and Building Envelope, Glazing if they can meet most of recommendations from 50% AEDG?

1
Wed Mar 16, 2016, 11:07 pm

Envelope CxA Requirements

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Risto Beatty  on 

Do the rules for who can be a CxA also apply to envelope commissioning? That is, can the envelope consultant on a project also perform the envelope commissioning?

1
Fri Apr 21, 2017, 4:29 pm

Single tenant O&M certification on a multitenant building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ricardo Sá  on 

LEED O&M 2009 reference guide stated (page xxii) that "certification applies only to whole buildings" and that "the project of a multitenant building must involve at least 90% of the total gros

1
Thu May 26, 2016, 6:34 pm

Pharmaceutical Manufacturing factory project

Healthcare-v4 MPR1:Must be in a permanent location on existing land
posted by  Magda Aghababyan  on 

Hi, We are going to start a new LEED project for a pharmaceutical manufacturing facility building which will be started in a few months.

1
Sat Aug 26, 2017, 3:26 pm