Forum quick links
Open Space: Fence
NC-v4 SSc3:Open spaceposted by Sophie Brauer on
Hello, I'm trying to assess how much of our project site qualifies as open space.
MRP3- minimum square meter for group certification
Hospitality-NC-v4 MPR3:Must comply with project size requirementsposted by Giuseppina Amorusi on
Hi all We are developing a pre-assessment to evaluate the certification level under LEED v4 for a campus. In the campus we have small buildings of about 80 square meters each (hospitality rooms), a
Glisofat
EBOM-v4 SSc5:Site managementposted by Emmanuel Pauwels on
There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice?
what all is included in material cost
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Brianna Brandsen on
Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?
The difference of Reused, Salvaged, refurbished
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Qiang Zhang on
As posted for Materials reuse.
Nonresidential Density (FAR)
NC-v4 LTc4:Surrounding density and diverse usesposted by Sarah Burnett on
Hello! Quick question about the Nonresidential Density (FAR) - Our site is located in the heart of a very dense urban area, the residential density exceeds the requirement and so does the Nonres
Green-e equivalency
NC-v4 EAc7:Green power and carbon offsetsposted by LEED Pro Consultant on
I have a question regarding using carbon credits (CERs) from a Clean Development Mechanism project for a New Construction V4 project.
Ferry Service - defined
Data-Centers-NC-v4 LTc5:Access to quality transitposted by Vada Kornegay on
I am doing a project on a college campus. Can someone confirm whether or not the campus bus system is or is not a "ferry service"?
PPA as renewable energy production?
CS-v4 EAc5:Renewable energy productionposted by Lai-San wong on
Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.
Midrise Site Credits as Master Site credits
Mid-Rise-v4 LTc2:Site selectionposted by Jennifer Rennick on
I'm working on a project with multiple residential buildings in 4 types grouped on a 20 acre site. We'd like to use master site credits along with LEED Homes certification.