Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Open Space: Fence

NC-v4 SSc3:Open space
posted by  Sophie Brauer  on 

Hello, I'm trying to assess how much of our project site qualifies as open space.

1
Mon May 2, 2016, 3:49 pm

MRP3- minimum square meter for group certification

Hospitality-NC-v4 MPR3:Must comply with project size requirements
posted by  Giuseppina Amorusi  on 

Hi all We are developing a pre-assessment to evaluate the certification level under LEED v4 for a campus. In the campus we have small buildings of about 80 square meters each (hospitality rooms), a

1
Tue Jan 17, 2017, 8:58 pm

Glisofat

EBOM-v4 SSc5:Site management
posted by  Emmanuel Pauwels  on 

There are contradictory studies related to the use of glisofat as a herbicide. Would spraying with a mixture containing 30% glifosat be an aceptable practice?

1
Tue Jun 6, 2017, 3:22 pm

what all is included in material cost

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Brianna Brandsen  on 

Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?

1
Mon Aug 15, 2016, 9:30 pm

Nonresidential Density (FAR)

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Sarah Burnett  on 

Hello! Quick question about the Nonresidential Density (FAR) - Our site is located in the heart of a very dense urban area, the residential density exceeds the requirement and so does the Nonres

1
Mon Nov 21, 2016, 7:32 pm

Green-e equivalency

NC-v4 EAc7:Green power and carbon offsets
posted by  LEED Pro Consultant  on 

I have a question regarding using carbon credits (CERs) from a Clean Development Mechanism project for a New Construction V4 project.

1
Sun Nov 2, 2014, 11:24 pm

Ferry Service - defined

Data-Centers-NC-v4 LTc5:Access to quality transit
posted by  Vada Kornegay  on 

I am doing a project on a college campus. Can someone confirm whether or not the campus bus system is or is not a "ferry service"?

1
Sat Aug 26, 2017, 11:13 am

PPA as renewable energy production?

CS-v4 EAc5:Renewable energy production
posted by  Lai-San wong  on 

Hi! In the requirement for EAc5 (BD+C) it is stated: "The use of solar gardens or community renewable energy systems is allowed if both of the following requirements are met.

1
Mon Aug 28, 2017, 1:41 pm

Midrise Site Credits as Master Site credits

Mid-Rise-v4 LTc2:Site selection
posted by  Jennifer Rennick  on 

I'm working on a project with multiple residential buildings in 4 types grouped on a 20 acre site. We'd like to use master site credits along with LEED Homes certification.

1
Tue Jan 22, 2019, 7:45 am