Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Reporting and metering frequency

NC-v4 WEc4:Water metering
posted by  Lorne Mlotek  on 

In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi

1
Tue Apr 21, 2015, 4:55 pm

Is there a timeframe for the minimum number of cycles?

NC-v4 WEc3:Cooling tower water use
posted by  Gregory Martin  on 

I am working on a presentation to educate my office on Lv4. This being a new credit I don't think I am totally understanding the requirements.

0

ASHRAE Advanced Energy Design Guide - Option 2

NC-v4 EAc2:Optimize energy performance
posted by  Aaron Wascher  on 

Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.

1
Mon Oct 5, 2015, 10:00 pm

Tab 6-1 and 6-4

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?

1
Thu Apr 20, 2017, 3:37 pm

Campus Cooling Tower

NC-v4 WEc3:Cooling tower water use
posted by  Brightworks Sustainability  on 

My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.

0

New and Renovation: How to Determine Points from Table 1

NC-v4 EAc2:Optimize energy performance
posted by  James Keohane  on 

I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.

1
Fri May 26, 2017, 1:46 pm

Glare control device simulation - Option 2

NC-v4 EQc7:Daylight
posted by  Hanh Truong  on 

Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).

1
Thu Jul 13, 2017, 2:17 pm

ESC plan

NC-v4 SSp1:Construction activity pollution prevention
posted by  Ana Paula Quiros  on 

Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.

1
Tue Jan 17, 2017, 4:37 pm

Analysis areas for large building

NC-v4 EQc7:Daylight
posted by  Jody Lee Potvin-Jones  on 

Hi, For EQc7: Daylight.

1
Thu Sep 18, 2014, 3:10 pm

Garages and Service Bays

ND-Plan-v4 NPDp1:Walkable streets
posted by  David West  on 

Does surface parking count as a garage and/or service bay?

0