Forum quick links
Reporting and metering frequency
NC-v4 WEc4:Water meteringposted by Lorne Mlotek on
In LEED V4 O+M a project must: • All meters must be recorded at least weekly • Commit to sharing with USGBC the resulting water usage data for a five-year period Is there not frequency of recordi
Is there a timeframe for the minimum number of cycles?
NC-v4 WEc3:Cooling tower water useposted by Gregory Martin on
I am working on a presentation to educate my office on Lv4. This being a new credit I don't think I am totally understanding the requirements.
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Tab 6-1 and 6-4
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Art classrooms are considered both in Tab. 6-1 and in Tab. 6-4. If we respect Tab. 6-4, could we avoid the verification of Tab. 6-1 (i.e. could we avoid the outdoor air supply)?
Campus Cooling Tower
NC-v4 WEc3:Cooling tower water useposted by Brightworks Sustainability on
My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.
New and Renovation: How to Determine Points from Table 1
NC-v4 EAc2:Optimize energy performanceposted by James Keohane on
I am working on a project that is approx. 24,600sf which includes 11,600s.f. of major renovation with 13,000s.f new construction.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
ESC plan
NC-v4 SSp1:Construction activity pollution preventionposted by Ana Paula Quiros on
Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.
Analysis areas for large building
NC-v4 EQc7:Daylightposted by Jody Lee Potvin-Jones on
Hi, For EQc7: Daylight.
Garages and Service Bays
ND-Plan-v4 NPDp1:Walkable streetsposted by David West on
Does surface parking count as a garage and/or service bay?